Coordinatore | UNIVERSITY COLLEGE CORK, NATIONAL UNIVERSITY OF IRELAND, CORK
Organization address
address: Western Road contact info |
Nazionalità Coordinatore | Ireland [IE] |
Totale costo | 14˙898˙019 € |
EC contributo | 9˙986˙231 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-OCEAN-2013 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-12-01 - 2017-11-30 |
# | ||||
---|---|---|---|---|
1 |
UNIVERSITY COLLEGE CORK, NATIONAL UNIVERSITY OF IRELAND, CORK
Organization address
address: Western Road contact info |
IE (CORK) | coordinator | 1˙094˙087.20 |
2 |
NORSK MARINTEKNISK FORSKNINGSINSTITUTT AS
Organization address
address: OTTO NIELSENS VEG 10 contact info |
NO (TRONDHEIM) | participant | 987˙522.25 |
3 |
FORCE TECHNOLOGY
Organization address
address: PARK ALLE 345 contact info |
DK (BRONDBY) | participant | 690˙485.00 |
4 |
GAVIN AND DOHERTY GEOSOLUTIONS LTD
Organization address
address: KILLACLORAN UPPER contact info |
IE (Aughrim) | participant | 664˙460.00 |
5 |
MAERSK TRAINING SVENDBORG AS
Organization address
address: DYREKREDSEN RANTZAUSMINDE 4 contact info |
DK (SVENDBORG) | participant | 444˙850.00 |
6 |
THE UNIVERSITY OF EDINBURGH
Organization address
address: OLD COLLEGE, SOUTH BRIDGE contact info |
UK (EDINBURGH) | participant | 439˙065.00 |
7 |
ELECTRICITE DE FRANCE S.A.
Organization address
address: avenue de Wagram 22-30 contact info |
FR (PARIS) | participant | 409˙168.80 |
8 |
OFFSHORE WIND ASSISTANCE NV
Organization address
address: SCHELDEDIJK 30 HAVEN 1025 contact info |
BE (ZWIJNDRECHT) | participant | 382˙760.00 |
9 |
UNIVERSITY OF PORTSMOUTH HIGHER EDUCATION CORPORATION
Organization address
address: "University House, Winston Churchill Avenue" contact info |
UK (PORTSMOUTH) | participant | 361˙413.60 |
10 |
SINTEF ENERGI AS
Organization address
address: Sem Saelandsveg 11 contact info |
NO (TRONDHEIM) | participant | 349˙353.00 |
11 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 319˙273.50 |
12 |
KONGSBERG MARITIME AS
Organization address
address: STRANDPROMENADEN 50 contact info |
NO (HORTEN) | participant | 316˙160.00 |
13 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA 18 contact info |
ES (ALCOBENDAS) | participant | 303˙227.00 |
14 |
NORSK AUTOMATISERING AS
Organization address
address: MARKAPLASSEN 88 contact info |
NO (RANHEIM) | participant | 299˙875.20 |
15 |
EUROPEAN WIND ENERGY ASSOCIATION ASBL
Organization address
address: RUE D ARLON 80 contact info |
BE (BRUXELLES) | participant | 294˙148.50 |
16 |
DELTA DENIZCILIK MUHENDISLIK VE BILGISAYAR SANAYI VE TICARET ANONIM SIRKETI
Organization address
address: Okul Sok. Altunizade Sitesi 3/12 contact info |
TR (ISTANBUL) | participant | 281˙400.00 |
17 |
LLOYD'S REGISTER EMEA
Organization address
address: FENCHURCH STREET 71 contact info |
UK (LONDON) | participant | 244˙447.00 |
18 |
UNIVERSITY OF HULL
Organization address
address: COTTINGHAM ROAD contact info |
UK (HULL) | participant | 243˙925.20 |
19 |
NATIONAL TECHNICAL UNIVERSITY OF ATHENS - NTUA
Organization address
address: HEROON POLYTECHNIOU 9 ZOGRAPHOU CAMPUS contact info |
EL (ATHINA) | participant | 214˙800.00 |
20 |
IBERDROLA RENOVABLES ENERGIA SA
Organization address
address: CALLE MENORCA 19/13 contact info |
ES (VALENCIA) | participant | 210˙600.00 |
21 |
AALBORG UNIVERSITET
Organization address
address: FREDRIK BAJERS VEJ 5 contact info |
DK (AALBORG) | participant | 206˙400.00 |
22 |
"CONSORCIO PARA EL DISENO, CONSTRUCCION, EQUIPAMIENTO Y EXPLOTACION DE LA PLATAFORMA OCEANICA DE CANARIAS"
Organization address
address: CARRETERA DE TALIARTE contact info |
ES (TELDE) | participant | 203˙930.40 |
23 |
CORK INSTITUTE OF TECHNOLOGY
Organization address
address: ROSSA AVENUE BISHOPSTOWN contact info |
IE (CORK) | participant | 187˙600.00 |
24 |
1-TECH
Organization address
address: Rue du Luxembourg 23 contact info |
BE (Bruxelles) | participant | 176˙200.00 |
25 |
HAVEN OOSTENDE AUTONOOM GEMEENTELIJK HAVENBEDRIJF
Organization address
address: SLIJKENSESTEENWEG 2 contact info |
BE (OOSTENDE) | participant | 117˙600.00 |
26 |
A2SEA A/S
Organization address
address: KRAFTVAERKSVEJ 53 contact info |
DK (FREDERICIA) | participant | 108˙000.00 |
27 |
RAPPEL ENTERPRISES LIMITED - ARKLOW MARINE SERVICES
Organization address
address: NORTH QUAY contact info |
IE (ARKLOW - CO. WICKLOW) | participant | 104˙062.50 |
28 |
B9 ENERGY O&M LIMITED
Organization address
address: WILLOWBANK ROAD 5 MILLBROOK contact info |
UK (LARNE ANTRIM) | participant | 98˙437.50 |
29 |
SHIPS AND MARITIME EQUIPMENT ASSOCIATION OF EUROPE ASBL
Organization address
address: RUE MARIE DE BOURGOGNE 52 54 52 contact info |
BE (BRUXELLES) | participant | 88˙200.00 |
30 |
VASCO GALLEGA SOCIEDAD DE CARTERA SL
Organization address
address: Calle Pontevedra num.4 planta 3a contact info |
ES (VIGO) | participant | 82˙060.80 |
31 |
EDP INOVACAO SA
Organization address
address: PRACA MARQUES DE POMBAL 12 contact info |
PT (LISBOA) | participant | 62˙718.50 |
32 |
Community of European Shipyards Associations asbl
Organization address
address: rue Marie de Bourgogne 52 contact info |
BE (Brussels) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the development of state of the art technologies and tools.
The offshore wind industry in existing near shore shallow sites has yet to become cost competitive with traditional forms of energy while new sites are being planned for greater distances from shore or deeper water bringing new challenges. The offshore wind industry has not yet applied lean principles to the logistical operations of the wind farm in all stages of the lifecycle as proposed by the LEANWIND project. “Lean” principles were originally developed by Toyota to optimise the processes of manufacturing industries; these principles of optimisation and efficiency have subsequently been adopted by many other industries to remove wasteful stages and streamline processes.
This new “lean” paradigm will be applied to each of the critical project stages: logistical processes, shore-based transport links, port and staging facilities, vessels, lifting equipment, safety and O&M. The LEANWIND approach will ensure that unnecessarily complex or wasteful stages of the development process are removed, flow between the required stages is streamlined, quality is enhanced and thus overall cost and time efficiency improved to enable the industry to bridge the gap between current costs and industry cost aspirations. Properly applied, lean management will improve quality, reliability and H&S standards across the project supply chain and throughout the wind farm lifecycle.'
DEveloping the MObility CRedits Integrated platform enabling travellers to improve urban TranspOrt Sustainability
Read More