HOTPHASEDARRAY

High Temperature Pipe Structural Health Monitoring System utilising Phased Array probes on TOFD configuration

 Coordinatore "INETEC-INSTITUT ZA NUKLEARNU TEHNOLOGIJU DRUSTVO S OGRANICENOM ODGOVORNOSCU ZA ISTRAZIVACKO RAZVOJNE I KONSULTING USLUGE, PROIZVODNJU I TRGOVINU" 

 Organization address address: DOLENICA 28 LUCKO
city: ZAGREB
postcode: 10 250

contact info
Titolo: Ms.
Nome: Martina
Cognome: Fabijan
Email: send email
Telefono: +385 91 6594 575
Fax: +385 1 6530 849

 Nazionalità Coordinatore Croatia [HR]
 Totale costo 1˙298˙688 €
 EC contributo 997˙000 €
 Programma FP7-SME
Specific Programme "Capacities": Research for the benefit of SMEs
 Code Call FP7-SME-2013
 Funding Scheme BSG-SME
 Anno di inizio 2014
 Periodo (anno-mese-giorno) 2014-01-01   -   2015-12-31

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    "INETEC-INSTITUT ZA NUKLEARNU TEHNOLOGIJU DRUSTVO S OGRANICENOM ODGOVORNOSCU ZA ISTRAZIVACKO RAZVOJNE I KONSULTING USLUGE, PROIZVODNJU I TRGOVINU"

 Organization address address: DOLENICA 28 LUCKO
city: ZAGREB
postcode: 10 250

contact info
Titolo: Ms.
Nome: Martina
Cognome: Fabijan
Email: send email
Telefono: +385 91 6594 575
Fax: +385 1 6530 849

HR (ZAGREB) coordinator 223˙731.94
2    VERMON SA

 Organization address address: RUE DU GENERAL RENAULT 180
city: TOURS CEDEX 1
postcode: 37038

contact info
Titolo: Mr.
Nome: An
Cognome: Nguyen-Dinh
Email: send email
Telefono: +33 247374278
Fax: +33 247381545

FR (TOURS CEDEX 1) participant 235˙607.31
3 ENKON ENDUSTRIYEL KONTROL KAYNAK SANAYI VE TICARET LIMITED SIRKETI TR participant 221˙570.00
4    TECNITEST INGENIEROS SL

 Organization address address: Calle Ciudad de Frias 1-Nave 4
city: MADRID
postcode: 28021

contact info
Titolo: Mr.
Nome: Rafael
Cognome: Gaitero
Email: send email
Telefono: +34 917 961 418
Fax: +34 91 795 47 59

ES (MADRID) participant 198˙946.25
5    BRUNEL UNIVERSITY

 Organization address address: Kingston Lane
city: UXBRIDGE
postcode: UB83PH

contact info
Titolo: Ms.
Nome: Teresa
Cognome: Waller
Email: send email
Telefono: +44 1895 266206

UK (UXBRIDGE) participant 39˙562.99
6    INNOVATIVE TECHNOLOGY AND SCIENCE LIMITED - INNOTECUK

 Organization address address: HILDERSHAM ROAD NORTH WING THE OLD LIVERY
city: CAMBRIDGE
postcode: CB21 6DR

contact info
Titolo: Mr.
Nome: Hassam
Cognome: Ali Miabhoy
Email: send email
Telefono: +44 1223893209

UK (CAMBRIDGE) participant 35˙615.01
7    CERAMTEC AG

 Organization address address: Fabrikstrasse 23-29
city: PLOCHINGEN
postcode: 73207

contact info
Titolo: Dr.
Nome: Hans-Jürgen
Cognome: Schreiner
Email: send email
Telefono: +49 9123770
Fax: +49 912377576

DE (PLOCHINGEN) participant 22˙976.50
8    AINOOUCHAOU PLIROFORIKI AE

 Organization address address: L KIPHISIAS 116 KAI DAVAKI 1
city: ATHINA
postcode: 11526

contact info
Titolo: Ms.
Nome: Aikaterini
Cognome: Fotopoulou
Email: send email
Telefono: +30 210 6041425 301
Fax: +30 210 6041675

EL (ATHINA) participant 18˙990.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

defect    situations    defects    monitoring    power    lifetime    pipe    create    safety    catastrophic    pipes    steam    superheated    plants   

 Obiettivo del progetto (Objective)

'Uncertainties in the calculation of the lifetime of superheated steam pipes in power plants that contain a minor defect create situations with potentially catastrophic results, typically costing €120 million per event. Superheated steam pipes are periodically inspected and depending on their defects sizes they may be replaced after a lifetime assessment has been performed. Common errors in defect sizing create dangerous situations as size underestimation will result in a pipe prone to failure. Inetec and Enkon, often face this difficult issue when performing inspections for their customers, thus the need for a frequent in-service and accurate monitoring of defects on pipes was identified. The final goal of the HotPhasedArray project is the development of a Structural Health Monitoring (SHM) system for superheated steam pipes. The expected benefits of the project are: • Increased safety in electrical production power plants; • Elimination of catastrophic accidents from superheated steam pipe failures; • Decrease of the required shut-down time for inspection purposes; • Projected Return on Investment of 101:1 from system sales and operator savings; and Increase in confidence in the operational safety of thermal power and nuclear energy plants.'

Altri progetti dello stesso programma (FP7-SME)

SOLGAIN (2012)

Competitive stationary low concentrating solar module of novel design

Read More  

MONICO (2008)

Fibre Optics-Based Intelligent MONItoring and Assessment System for Proactive Maintenance and Seismic Disaster Prevention in Reinforced COncrete Tunnel Linings

Read More  

RECOICE (2014)

"DEVELOPMENT OF A LOW COST, LOW POWER CONSUMPTION SYSTEM FOR MANUFACTURING LIQUID ICE FOR FISHING"

Read More