Coordinatore | AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE,L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE
Organization address
address: Lungotevere Grande Ammiraglio Thaon di Revel 76 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 2˙858˙447 € |
EC contributo | 1˙633˙895 € |
Programma | FP7-JTI
Specific Programme "Cooperation": Joint Technology Initiatives |
Code Call | FCH-JU-2013-1 |
Funding Scheme | JTI-CP-FCH |
Anno di inizio | 2014 |
Periodo (anno-mese-giorno) | 2014-05-01 - 2017-04-30 |
# | ||||
---|---|---|---|---|
1 |
AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE,L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE
Organization address
address: Lungotevere Grande Ammiraglio Thaon di Revel 76 contact info |
IT (ROMA) | coordinator | 335˙856.40 |
2 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 319˙540.00 |
3 |
Elcogen OY
Organization address
address: TEKNOBULEVARDI 3-5 contact info |
FI (VANTAA) | participant | 265˙650.00 |
4 |
BORIT NV
Organization address
address: LAMMERDRIES 18 D contact info |
BE (GEEL) | participant | 212˙846.60 |
5 |
CLAUSTHALER UMWELTTECHNIK INSTITUT GMBH
Organization address
address: LEIBNIZSTRASSE 21-23 contact info |
DE (CLAUSTHAL ZELLERFELD) | participant | 159˙100.00 |
6 |
FLEXITALLIC LTD
Organization address
address: SCANDINAVIA MILL HUNSWORTH LANE contact info |
UK (CLECKHEATON) | participant | 123˙372.00 |
7 |
AKTSIASELTS ELCOGEN
Organization address
address: SAEVESKI 10A contact info |
EE (TALLIN) | participant | 111˙520.00 |
8 |
SANDVIK MATERIALS TECHNOLOGY AB
Organization address
address: Asgatan 1 contact info |
SE (SANDVIKEN) | participant | 106˙010.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'This project combines European know-how in single cells, coatings, sealing, and stack design to produce a novel 1 kW SOFC stack of unprecedented performance, together with the proof of concept of a 10 kWe SOFC stack. Improvements over the state of the art in cost, performance, efficiency, and reliability will be proven, covering all top-level objectives mentioned in the topic. The stacks will be developed according to system integrators’ requirements guided by an industrial steering group. The target application of the development is stationary and residential combined heat and power production based on natural gas, and will form the basis for Elcogen Oy’s commercial SOFC stack technology. All manufacturing methods, stack designs, and materials are chosen so that they are suitable for mass production and enable 1000 €/kW profitable stack price, which is a significant improvement to current state of the art. These methods, designs, and materials have been demonstrated successfully in small-scale and require the scale-up to suit manufacturing of 10 kWe SOFC stacks. For example, high performance of Elcogen cells and short stacks were already demonstrated with 100x100 mm2 cell size, but in this project cells and stack will be further improved and scaled up to larger 120x120 mm2 size. The project is based on the products of industrial partners and motivated by their interest to consolidate an optimized supply-chain and subsequently commercialize a high-performance product at very sharp prices. To this effect, the activity will pay great attention to designing the stack for mass production processes. One industrial partner is involved for each key function: Elcogen AS (cells), Elcogen Oy (stack assembly and production), Sandvik (interconnects and coatings), and Flexitallic Ltd (sealing). Selected research institutions complete the partnership to focus the development process towards a reliable product.'
High speed metallic material removal under acceptable surface integrity for rotating frame
Read MoreIntegrated hydrogen power packs for portable and other autonomous applications
Read MoreDevelopment of a low cost Advanced gamma Titanium Aluminide Casting Technology
Read More