Coordinatore | BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY*
Organization address
address: Sirius House B54, Adastral Park, Martlesham Heath pp B54/70 contact info |
Nazionalità Coordinatore | United Kingdom [UK] |
Totale costo | 9˙115˙722 € |
EC contributo | 5˙816˙339 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-ICT-2007-1 |
Funding Scheme | CP |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-01-01 - 2011-03-31 |
# | ||||
---|---|---|---|---|
1 |
BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY*
Organization address
address: Sirius House B54, Adastral Park, Martlesham Heath pp B54/70 contact info |
UK (Ipswich, Suffolk) | coordinator | 0.00 |
2 |
ATHENS UNIVERSITY OF ECONOMICS AND BUSINESS - RESEARCH CENTER
Organization address
address: KEFALLINIAS STREET contact info |
EL (ATHENS) | participant | 0.00 |
3 |
DEUTSCHE TELEKOM AG
Organization address
address: FRIEDRICH-EBERT-ALLEE contact info |
DE (BONN) | participant | 0.00 |
4 |
EURESCOM-EUROPEAN INSTITUTE FOR RESEARCH AND STRATEGIC STUDIES IN TELECOMMUNICATIONS GMBH
Organization address
address: Wieblinger Weg contact info |
DE (HEIDELBERG) | participant | 0.00 |
5 |
NEC EUROPE LTD
Organization address
address: NEC HOUSE, VICTORIA ROAD contact info |
UK (LONDON) | participant | 0.00 |
6 |
NOKIA OYJ
Organization address
address: KEILALAHDENTIE 4 contact info |
FI (ESPOO) | participant | 0.00 |
7 |
ROKE MANOR RESEARCH LIMITED
Organization address
address: FARADAY HOUSE SIR WILLIAM SIEMENS SQUARE FRIMLEY CAMBERLEY contact info |
UK (SURREY) | participant | 0.00 |
8 |
STANFORD LAW SCHOOL
Organization address
address: 559 NATHAN ABBOTT WAY contact info |
US (STANFORD) | participant | 0.00 |
9 |
T-SYSTEMS INTERNATIONAL GMBH
Organization address
address: Hahnstrasse contact info |
DE (FRANKFURT) | participant | 0.00 |
10 |
UNIVERSIDAD CARLOS III DE MADRID
Organization address
address: CALLE MADRID contact info |
ES (GETAFE (MADRID)) | participant | 0.00 |
11 |
UNIVERSITE CATHOLIQUE DE LOUVAIN
Organization address
address: Place De L'Universite contact info |
BE (LOUVAIN-LA-NEUVE) | participant | 0.00 |
12 |
UNIVERSITY COLLEGE LONDON
Organization address
address: Gower Street contact info |
UK (LONDON) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
This Trilogy proposal is for a 3-year Integrated Project targeting Challenge 1 of the 7th Framework Programme: 'Pervasive and Trusted Network and Service Infrastructures'. The project scope lies entirely within Objective 1.1, 'The Network of the Future'.nThe aim of the project is to develop new solutions for the control architecture of the Internet that remove the known and emerging technical deficiencies while avoiding prejudging commercial and social outcomes for the different players. The focus is the generic control functions of the Internet – the neck of the hour-glass, but for control:n* Reachability: The main focus is the problem of inter-domain routing, including policy control but also integrating filtering at trust boundaries (e.g. firewalls, NATs). Key issues include multihoming, scalability and fast convergence.n* Resource control: The main focus is how to deliver effective and efficient control of sharing of resource. Key issues include how to share resources fairly and stop cheating, high speed congestion control and load balancing (traffic engineering).nBut further, all this must be under:n* Social and Commercial Control: the architecture will permit conflicting outcomes to coexist and evolve and will not embed assumptions that unreasonably favour certain types of industry player: 'designed for tussle'.nOur objective is bold: to re-architect the world's ICT infrastructure. In order to be credible, we will have to deliver a coherent set of changes solving technical and commercial problems together: a unified control architecture for the Internet that can be adapted in a scalable, dynamic, autonomous and robust manner to local operational and business requirements.nOverall the project delivers:n* new technical and economic concepts, architecture and protocols;n* simulation, prototyping, strategic analysis and dissemination work, especially standardisation at the IETF.nThe focus moves from the first to the second over the project's lifetime.