Coordinatore | ANSALDO NUCLEARE SPA
Organization address
address: VIA LORENZI NICOLA 8 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 5˙699˙396 € |
EC contributo | 2˙994˙088 € |
Programma | FP7-EURATOM-FISSION
EURATOM: Nuclear fission and radiation protection |
Code Call | FP7-Fission-2009 |
Funding Scheme | CP-FP |
Anno di inizio | 2010 |
Periodo (anno-mese-giorno) | 2010-04-02 - 2013-10-01 |
# | ||||
---|---|---|---|---|
1 |
ANSALDO NUCLEARE SPA
Organization address
address: VIA LORENZI NICOLA 8 contact info |
IT (GENOVA) | coordinator | 571˙074.00 |
2 |
AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE,L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE
Organization address
address: Lungotevere Grande Ammiraglio Thaon di Revel 76 contact info |
IT (ROMA) | participant | 370˙000.00 |
3 |
EMPRESARIOS AGRUPADOS INTERNACIONA L SA
Organization address
address: CALLE MAGALLANES 3 contact info |
ES (MADRID) | participant | 307˙600.00 |
4 |
STUDIECENTRUM VOOR KERNENERGIE
Organization address
address: Herrmann Debrouxlaan 40 contact info |
BE (Brussel) | participant | 306˙330.00 |
5 |
Karlsruher Institut fuer Technologie
Organization address
address: Kaiserstrasse 12 contact info |
DE (Karlsruhe) | participant | 304˙000.00 |
6 |
NUCLEAR RESEARCH AND CONSULTANCY GROUP
Organization address
address: Westerduinweg 3 contact info |
NL (PETTEN) | participant | 130˙000.00 |
7 |
JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION
Organization address
address: Rue de la Loi 200 contact info |
BE (BRUSSELS) | participant | 128˙900.00 |
8 |
PAUL SCHERRER INSTITUT
Organization address
address: Villigen contact info |
CH (VILLIGEN PSI) | participant | 125˙280.00 |
9 |
COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
FR (PARIS 15) | participant | 124˙387.00 |
10 |
KUNGLIGA TEKNISKA HOEGSKOLAN
Organization address
address: Valhallavaegen 79 contact info |
SE (STOCKHOLM) | participant | 112˙500.00 |
11 |
Consorzio Interuniversitario Nazionale per la Ricerca Tecnologica Nucleare
Organization address
address: via Flavia 104 contact info |
IT (Roma) | participant | 110˙000.00 |
12 |
S.R.S. Servizi di Ricerche e Sviluppo Societa a Responsabilita Limitata
Organization address
address: Vicolo delle Palle 25-25/B contact info |
IT (Rome) | participant | 103˙300.00 |
13 |
M.E. RIVUS SRL
Organization address
address: S S 96 KM 97230 SNC contact info |
IT (GRUMO APPULA BARI) | participant | 100˙000.00 |
14 |
REGIA AUTONOMA PENTRU ACTIVITATI NUCLEARE DROBETA TR. SEVERIN RA SUCURSALA CERCETARI NUCLEARE PITESTI
Organization address
address: Cimpului 1 contact info |
RO (MIOVENI - ARGES) | participant | 80˙000.00 |
15 |
AKADEMIA GORNICZO-HUTNICZA IM. STANISLAWA STASZICA W KRAKOWIE
Organization address
address: AL ADAMA MICKIEWICZA 30 contact info |
PL (KRAKOW) | participant | 58˙000.00 |
16 |
USTAV JADERNEHO VYZKUMU REZ A.S.
Organization address
address: HUSINEC - REZ 130 contact info |
CZ (HUSINEC) | participant | 51˙997.00 |
17 |
ALMA MATER STUDIORUM-UNIVERSITA DI BOLOGNA
Organization address
address: Via Zamboni 33 contact info |
IT (BOLOGNA) | participant | 10˙720.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The LEADER proposal deals with the development to a conceptual level of a Lead Fast Reactor Industrial size plant and of a scaled demonstrator of the LFR technology. The proposal is based on previous achievements obtained during the 6th FP of the EU in the ELSY project but takes into account the indications emerged from the European Strategic Research Agenda as well as the main goals of the European Industrial Initiative on Fission. As a consequence the project is strongly committed to the conceptual design of a scaled/pilot plant to be constructed in the relatively short term. The focus of the first part of activity will be the resolutions of the key issues emerged in the frame of the ELSY project to reach a new reference reactor configuration. This updated reactor configuration of an industrial size LFR will be used to design a low cost and fully representative scaled down prototype of a suitable size. The project foresee an important involvement of End-Users and Safety Authorities from the beginning of the design process to help the plant conception and to assure high safety standards. Education and Training activities are included in a specific work package where European Universities are directly involved with the aim to grow-up the future nuclear energy designer. The LEADER projects takes strongly into account the others already proposed or on-going EU projects. All projects dedicated to R&D and material developments, projects dedicated to the development of ADS systems for transmutation or related to the development of fast reactors (VELLA, CDT, CP-ESFR, GETMAT, FAIRFUELS, ACSEPT, EUFRAT, F-BRIDGE, ACSEPT, ACTINET-I3, THINS) have strong synergies with LEADER toward the development of a Lead cooled fast reactor system. The project Partners are convinced that fostering the European efforts towards a LFR demonstration/pilot plant realization would be very beneficial, will speed up the development needed and establish Europe as a leader in this field.'
EU-funded scientists are developing a prototype nuclear generator based on next-generation technologies. The reactor promises to be sustainable, safe and cost effective, making it difficult to oppose its obvious benefits.