Explore the words cloud of the INTMET project. It provides you a very rough idea of what is the project "INTMET" about.
The following table provides information about the project.
Coordinator |
COBRE LAS CRUCES SA
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://www.intmet.eu/ |
Total cost | 7˙834˙976 € |
EC max contribution | 7˙834˙976 € (100%) |
Programme |
1. H2020-EU.3.5.3. (Ensuring the sustainable supply of non-energy and non-agricultural raw materials) |
Code Call | H2020-SC5-2015-one-stage |
Funding Scheme | RIA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-02-01 to 2019-01-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | COBRE LAS CRUCES SA | ES (SEVILLA) | coordinator | 2˙737˙426.00 |
2 | MINING AND METALLURGY INSTITUTE BOR LTD | RS (BOR) | participant | 904˙656.00 |
3 | OUTOTEC (FINLAND) OY | FI (ESPOO) | participant | 799˙875.00 |
4 | TECNICAS REUNIDAS SA | ES (MADRID) | participant | 710˙625.00 |
5 | BUREAU DE RECHERCHES GEOLOGIQUES ET MINIERES | FR (ORLEANS) | participant | 581˙893.00 |
6 | MINPOL GMBH | AT (MARKT PIESTING) | participant | 453˙125.00 |
7 | SIEC BADAWCZA LUKASIEWICZ - INSTYTUT METALI NIEZELAZNYCH | PL (GLIWICE) | participant | 419˙000.00 |
8 | INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE PENTRU METALE NEFEROASE SIRARE-IMNR | RO (PANTELIMON ILFOV) | participant | 370˙001.00 |
9 | MINTEK | ZA (RANDBURG) | participant | 327˙748.00 |
10 | AGQ MINING & BIOENERGY SL | ES (BURGUILLOS) | participant | 301˙275.00 |
11 | SOMINCOR - SOCIEDADE MINEIRA DE NEVES-CORVO SA | PT (CASTRO VERDE) | participant | 194˙875.00 |
12 | KGHM POLSKA MIEDZ SA | PL (LUBIN) | participant | 34˙475.00 |
13 | GUENTER TIESS | AT (DREISTETTEN) | participant | 0.00 |
The INTMET approach represents a unique technological breakthrough to overcome the limitations related to difficult low grade and complex ores to achieve high efficient recovery of valuable metals (Cu, Zn, Pb, Ag) and CRM (Co, In, Sb). Main objective of INTMET is applying on-site mine-to-metal hydroprocessing of the produced concentrates enhancing substantially raw materials efficiency thanks to increase CuZnPb recovery over 60% vs. existing selective flotation. 3 innovative hydrometallurgical processes (atmospheric, pressure and bioleaching), and novel more effective metals extraction techniques (e.g. Cu/Zn-SX-EW, chloride media, MSA, etc) will be developed and tested at relevant environment aiming to maximise metal recovery yield and minimising energy consumption and environmental footprint. Additionally secondary materials like tailings and metallurgical wastes will be tested as well for metals recovery and sulphur valorisation. The technical, environmental and economic feasibility of the entire approaches will be evaluated to ensure a real business solution of the integrated INTMET process. INTMET will be economically viable thanks to diversification of products (Cu, Zn, Pb), high-profitable solution (producing commodities not concentrates), with lower operation and environmental costs (on-site hydroprocessing will avoid transport to smelters) and allowing mine-life extension developing a new business-model concept based on high efficient recovery of complex ores that will ensure EU mining industry competitiveness and employment. INTMET is fully aligned with EIP-RM validated in the PolymetOre Commitment where most of INTMET partners take part on and the market up-take solutions are guaranteed by an exploitation from industrially-driven consortia composed by 3 Mines, 2 SMEs (AGQ -waste&water tech provider; MINPOL -policy & exploitation expert), 2 tech providers (OUTOTEC and TR) and 5 complementary RTD´s with expertise in leaching and recovery metals processing
Report and results of stakeholder interaction activities - Interim | Documents, reports | 2019-08-30 13:50:35 |
Exploitation strategic plan, innovation plan and business model - initial | Documents, reports | 2019-08-30 13:50:35 |
Report on flotation laborotarory test works and pilot plant achievements and results | Documents, reports | 2019-08-30 13:50:35 |
Report on characterization of primary and secondary raw materials (initial) | Documents, reports | 2019-08-30 13:50:35 |
Detailed Dissemination Plan | Documents, reports | 2019-08-30 13:50:35 |
Report on flotation pilot plant design and arrangement plan | Documents, reports | 2019-08-30 13:50:35 |
Exploitation strategic plan and business model - final | Documents, reports | 2019-08-30 13:50:35 |
Report on characterization of primary and secondary raw materials (final) | Documents, reports | 2019-08-30 13:50:34 |
Public Report on Technology and Life Cycle Assessment | Documents, reports | 2019-08-30 13:50:35 |
Report and results of stakeholder interaction activities - final | Documents, reports | 2019-08-30 13:50:35 |
Take a look to the deliverables list in detail: detailed list of INTMET deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTMET" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "INTMET" are provided by the European Opendata Portal: CORDIS opendata.