# | ||||
---|---|---|---|---|
1 | INESS INtegrated European Signalling System | 2008 | 15˙734˙414.00 | 10˙015˙379.00 |
2 | ERRAC ROAD MAP ERRAC Road Map | 2009 | 1˙683˙513.00 | 1˙540˙994.00 |
3 | RIVAS Railway Induced Vibration Abatement Solutions | 2011 | 8˙163˙798.00 | 5˙199˙995.00 |
4 | MAINLINE "MAINtenance, renewaL and Improvement of rail transport iNfrastructure to reduce Economic and environmental impacts" | 2011 | 4˙331˙915.00 | 2˙972˙953.00 |
5 | RESTRAIL Reduction of Suicides and Trespasses on RAILway property | 2011 | 3˙868˙392.00 | 2˙816˙243.00 |
6 | FOSTER RAIL Future Of Surface Transport Research Rail | 2013 | 1˙836˙674.00 | 1˙659˙439.00 |
7 | CAPACITY4RAIL Increasing Capacity 4 Rail networks through enhanced infrastructure and optimised operations | 2013 | 15˙004˙919.00 | 9˙890˙105.00 |
L'Ente union internationale des chemins de fer partecipato anche in questi progetti.