# | ||||
---|---|---|---|---|
1 | ABV Enabling Architecture Based Verification and Validation of Mission-Critical Systems | 2007 | 100˙000.00 | 100˙000.00 |
2 | ALL-TIMES Integrating European timing analysis technology | 2007 | 2˙094˙492.00 | 1˙600˙000.00 |
3 | COMING Component-Based Design meets Model-Driven Engineering methodologies: improving the development of Embedded Systems | 2010 | 165˙628.00 | 165˙628.00 |
4 | APARTS Advanced Program Analysis for Real-Time Systems | 2010 | 193˙496.00 | 193˙496.00 |
5 | POET Pedagogies of Educational Transitions | 2013 | 222˙600.00 | 222˙600.00 |
6 | RETNET The European Industrial Doctorate Programme on Future Real-Time Networks | 2013 | 1˙260˙286.00 | 1˙260˙286.00 |
L'Ente maelardalens hoegskola partecipato anche in questi progetti.