ALL-TIMES

Integrating European timing analysis technology

 Coordinatore MAELARDALENS HOEGSKOLA 

 Organization address address: HOGSKOLEPLAN 1
city: VASTERAS
postcode: 721 23

contact info
Cognome: LISPER, BJöRN
Email: send email
Telefono: -151684
Fax: -101435

 Nazionalità Coordinatore Sweden [SE]
 Totale costo 2˙094˙492 €
 EC contributo 1˙600˙000 €
 Programma FP7-ICT
Specific Programme "Cooperation": Information and communication technologies
 Funding Scheme CP
 Anno di inizio 2007
 Periodo (anno-mese-giorno) 2007-12-01   -   2010-02-28

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    MAELARDALENS HOEGSKOLA

 Organization address address: HOGSKOLEPLAN 1
city: VASTERAS
postcode: 721 23

contact info
Cognome: LISPER, BJöRN
Email: send email
Telefono: -151684
Fax: -101435

SE (VASTERAS) coordinator 0.00
2    ABSINT ANGEWANDTE INFORMATIK GMBH

 Organization address address: SCIENCE PARK 1
city: SAARBRUECKEN
postcode: 66123

contact info

DE (SAARBRUECKEN) participant 0.00
3    GLIWA GMBH KNOW-HOW IN EMBEDDED SOFTWARE

 Organization address address: DOLMANNSTRASSE 4
city: MUENCHEN
postcode: 81541

contact info

DE (MUENCHEN) participant 0.00
4    RAPITA SYSTEMS LIMITED

 Organization address address: ITCENTER,YORK SCIENCE PARK,HESLINGTON YORK
city: YORK
postcode: YO10 5DG

contact info

UK (YORK) participant 0.00
5    SYMTAVISION GMBH

 Organization address address: FRANKFURTER STRASSE 3 B
city: BRAUNSCHWEIG

contact info

DE (BRAUNSCHWEIG) participant 0.00
6    TECHNISCHE UNIVERSITAET WIEN

 Organization address address: Karlsplatz 13
city: WIEN

contact info

AT (WIEN) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

tool    strengthen    combining    times    efficient    tools    software    timing   

 Obiettivo del progetto (Objective)

A large class of embedded systems has safety, availability, reliability, timing and performance requirements. Timing analysis is needed in many steps of the development process; it is a key to rapid designing and prototyping of embedded systems, to reduce system overall cost through efficient resource management (especially: tradeoffs when co-developing hardware and software), to find bottlenecks in the software, and to validate that the system meets its timing requirements. There is a growing awareness of the importance of correct timing for these systems, however, there is still a lack of efficient methods and tools for timing assessment and validation that can be used in European industry. The existing timing analysis technology by far does not exploit the potential inherent in European research results and timing tools.

The ALL-TIMES project aims at combining and developing research results and timing tools currently available and thus to strengthen the European lead in the timing analysis area. The ALL-TIMES project will enable interoperability of tools from SMEs and universities, and develop integrated tool chains using open tool frameworks and interfaces. By combining research results and commercial tools, ALL-TIMES will ensure the flow of ideas from basic research to practice.

ALL-TIMES will strengthen the competitiveness of several key industries in Europe, not only the automotive and aerospace areas (where partial awareness already exists) but also automation, manufacturing, robotics, medical, communication, and multimedia, and other market areas where timing is of importance.

Altri progetti dello stesso programma (FP7-ICT)

ARTIST4G (2010)

Advanced Radio Interface Technologies for 4G Systems

Read More  

ICTECOLLECTIVE (2009)

Harnessing ICT-enabled collective social behaviour

Read More  

INERTIA (2012)

Integrating Active, Flexible and Responsive Tertiary Prosumers into a Smart Distribution Grid

Read More