Coordinatore | SAAB AKTIEBOLAG
Organization address
address: . contact info |
Nazionalità Coordinatore | Sweden [SE] |
Totale costo | 32˙741˙455 € |
EC contributo | 19˙600˙000 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-AAT-2012-RTD-1 |
Funding Scheme | CP-IP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-09-01 - 2016-02-29 |
# | ||||
---|---|---|---|---|
1 |
SAAB AKTIEBOLAG
Organization address
address: . contact info |
SE (LINKOPING) | coordinator | 1˙725˙610.80 |
2 |
AIRBUS GROUP SAS
Organization address
address: Boulevard de Montmorency 37 contact info |
FR (PARIS) | participant | 1˙457˙917.50 |
3 |
DASSAULT AVIATION SA
Organization address
address: Rond-Point des Champs-Elysees - Marcel Dassault 9 contact info |
FR (PARIS) | participant | 1˙245˙425.00 |
4 |
GKN Aerospace Services Limited
Organization address
address: Ferry Road contact info |
UK (East Cowes) | participant | 1˙134˙918.00 |
5 |
KUNGLIGA TEKNISKA HOEGSKOLAN
Organization address
address: Valhallavaegen 79 contact info |
SE (STOCKHOLM) | participant | 1˙124˙548.00 |
6 |
DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV
Organization address
address: Linder Hoehe contact info |
DE (KOELN) | participant | 1˙117˙347.00 |
7 |
ALENIA AERMACCHI SPA
Organization address
address: PIAZZA MONTE GRAPPA 4 contact info |
IT (ROMA) | participant | 1˙072˙852.00 |
8 |
THE MANUFACTURING TECHNOLOGY CENTRE LIMITED LBG
Organization address
address: PILOT WAY - Ansty Business Park contact info |
UK (COVENTRY) | participant | 921˙838.90 |
9 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
ES (DONOSTIA-SAN SEBASTIAN) | participant | 788˙892.50 |
10 |
ISRAEL AEROSPACE INDUSTRIES LTD.
Organization address
address: BEN GURION INTERNATIONAL AIRPORT contact info |
IL (LOD) | participant | 704˙600.00 |
11 |
STICHTING NATIONAAL LUCHT- EN RUIMTEVAARTLABORATORIUM
Organization address
address: Anthony Fokkerweg 2 contact info |
NL (AMSTERDAM) | participant | 701˙954.75 |
12 |
LINKOPINGS UNIVERSITET
Organization address
address: CAMPUS VALLA contact info |
SE (LINKOPING) | participant | 701˙232.40 |
13 |
SHORT BROTHERS PLC
Organization address
address: "Airport Road, Queens Island" contact info |
UK (BELFAST) | participant | 673˙587.50 |
14 |
ECOLE NORMALE SUPERIEURE DE CACHAN
Organization address
address: Avenue du President Wilson 61 contact info |
FR (CACHAN) | participant | 500˙688.00 |
15 |
TUSAS-TURK HAVACILIK VE UZAY SANAYII AS
Organization address
address: FETHIYE MAHALLESI HAVACILIK BULVARI 17 KAZAN contact info |
TR (ANKARA) | participant | 466˙212.50 |
16 |
Prodtex AB
Organization address
address: KAPLANSGATAN 16 A contact info |
SE (SKOVDE) | participant | 446˙487.16 |
17 |
ARTTIC
Organization address
address: Rue du Dessous des Berges 58A contact info |
FR (PARIS) | participant | 433˙826.00 |
18 |
SOCIETE NATIONALE DE CONSTRUCTION AEROSPATIALE SONACA SA
Organization address
address: ROUTE NATIONALE CINQ PARK INDUSTRIEL contact info |
BE (GOSSELIES) | participant | 428˙462.50 |
19 |
BCT STEUERUNGS UND DV-SYSTEME GMBH
Organization address
address: Carlo-Schmid-Allee 3 contact info |
DE (DORTMUND) | participant | 394˙300.00 |
20 |
AIRBUS OPERATIONS GMBH
Organization address
address: Kreetslag 10 contact info |
DE (HAMBURG) | participant | 391˙065.00 |
21 |
AIRBUS OPERATIONS SAS
Organization address
address: ROUTE DE BAYONNE 316 contact info |
FR (TOULOUSE) | participant | 362˙042.50 |
22 |
UNIVERSITA DEGLI STUDI DI SALERNO
Organization address
address: VIA GIOVANNI PAOLO II 132 contact info |
IT (FISCIANO (SA)) | participant | 354˙000.00 |
23 |
SAMTECH SA
Organization address
address: RUE DES CHASSEURS ARDENNAIS 8 contact info |
BE (ANGLEUR) | participant | 325˙908.00 |
24 |
CHALMERS TEKNISKA HOEGSKOLA AB
Organization address
address: - contact info |
SE (GOETEBORG) | participant | 324˙090.50 |
25 |
TECNATOM S.A.
Organization address
address: Avenida Montes de Oca 1 contact info |
ES (SAN SEBASTIAN DE LOS REYES - MADRID) | participant | 310˙938.00 |
26 |
Airbus Operations Limited
Organization address
address: "New Filton House, Filton" contact info |
UK (BRISTOL) | participant | 248˙646.00 |
27 |
Creo Dynamics AB
Organization address
address: Westmansgatan 37 contact info |
SE (Linkoping) | participant | 237˙840.40 |
28 |
DELFOI SWEDEN AB
Organization address
address: GOTEBORGSVAGEN 89 contact info |
SE (MOLNDAL) | participant | 224˙322.84 |
29 |
COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
FR (PARIS 15) | participant | 213˙237.25 |
30 |
GKN AEROSPACE SWEDEN AB
Organization address
address: - contact info |
SE (TROLLHAETTAN) | participant | 205˙719.00 |
31 |
COBHAM ADVANCED COMPOSITES LIMITED
Organization address
address: BROOK ROAD contact info |
UK (WIMBORNE) | participant | 196˙250.00 |
32 |
SONAXIS SA
Organization address
address: rue Sophie Germain 6 contact info |
FR (BESANCON) | participant | 165˙240.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composites, metals and hybrid structures is affected by an important number of non-added value operations, which strongly cause disruptions and prevents fast ramp-up and high production rates. LOCOMACHS will focus on significantly reducing or totally eliminating the most time-consuming and hence expensive non-added value operations, e.g. temporary assembly to check gaps, shimming, dismantling and tool handling. The project will improve the design conditions which today strongly dictate the way part manufacture and assembly is performed. Important step changes will be made by dramatically improving the use of tolerance and geometrical variation management. The project will integrate existing technologies with missing breakthrough technologies developed and matured within LOCOMACHS. To support the industrialisation of future assembly production lines, key innovations such as intelligent drilling, high speed non-contact hole inspection, compact automation and active flexible tooling will be demonstrated. The design and assembly process improvements and breakthrough technologies will be validated on two physical partial wing box demonstrators, a virtual fuselage section demonstrator and additionally a virtual demonstrator showing a complete wing structure in the context of the next generation lean production flow. This Level 2 proposal is being submitted in the 5th Call FP7-AAT-2012-RTD-1 against the activity area AAT.2012.4.4-1 “Integrated approach and demonstration to lean manufacturing of metal, composite and hybrid aircraft / engine structures” by a Consortium led by Saab AB.'
Reducing costs and time-to-market are critical to retaining the competitiveness of EU airframe manufacturers. Enhancements all along the supply chain promise to help sales and significantly increase profits.