Coordinatore | ENERGOSYS ENERGIAHATEKONYSAGI FEJLESZTESI ES FINANSZIROZASI ZARTKORUENMUKODO RESZVENYTARSASAG*ENERGOSYSENERGY-EFFICIENCY DEVELOPMENT FINAN
Organization address
address: BENCZUR UTCA 45 3 EM 315 contact info |
Nazionalità Coordinatore | Hungary [HU] |
Totale costo | 5˙929˙338 € |
EC contributo | 4˙090˙288 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2013-NMP-ENV-EeB |
Funding Scheme | CP-IP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-09-01 - 2017-08-31 |
# | ||||
---|---|---|---|---|
1 |
ENERGOSYS ENERGIAHATEKONYSAGI FEJLESZTESI ES FINANSZIROZASI ZARTKORUENMUKODO RESZVENYTARSASAG*ENERGOSYSENERGY-EFFICIENCY DEVELOPMENT FINAN
Organization address
address: BENCZUR UTCA 45 3 EM 315 contact info |
HU (BUDAPEST) | coordinator | 654˙580.00 |
2 |
IZNAB SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA
Organization address
address: UL. PORY 78 contact info |
PL (WARSZAWA) | participant | 396˙140.00 |
3 |
SOLINTEL M&P SL
Organization address
address: Avenida de Jerez 33 contact info |
ES (Nuevo Baztan) | participant | 385˙940.00 |
4 |
ANCODARQ SL
Organization address
address: CALLE FUENTE SANTA 6 contact info |
ES (MADRID) | participant | 360˙960.00 |
5 |
SISTEMAS Y MONTAJES ELECTRICOS SL
Organization address
address: CALLE SAN MATEO 120 contact info |
ES (CASTELLON) | participant | 315˙760.00 |
6 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 307˙960.00 |
7 |
NOVAMINA CENTAR INOVATIVNIH TEHNOLOGIJA DOO
Organization address
address: JACKOVINSLI KLANEC 17 contact info |
HR (Zagreb) | participant | 303˙020.00 |
8 |
AIT Austrian Institute of Technology GmbH
Organization address
address: Donau-City-Strasse 1 contact info |
AT (WIEN) | participant | 295˙428.00 |
9 |
ISA - Intelligent Sensing Anywhere S.A.
Organization address
address: Rua D. Manuel I 92 contact info |
PT (Coimbra) | participant | 259˙680.00 |
10 |
R.E.D. SRL
Organization address
address: VIA GALILEO GALILEI 7 A/2 contact info |
IT (TEOLO PD) | participant | 209˙680.00 |
11 |
BUILDING RESEARCH ESTABLISHMENT LTD
Organization address
address: BUCKNALLS LANE contact info |
UK (WATFORD) | participant | 156˙500.00 |
12 |
CONSIGLIO NAZIONALE DELLE RICERCHE
Organization address
address: Piazzale Aldo Moro 7 contact info |
IT (ROMA) | participant | 123˙200.00 |
13 |
LAGROSS TANACSADOI ES PIACFEJLESZTESI KFT
Organization address
address: BENCZUR UTCA 45 3 EM 311 contact info |
HU (BUDAPEST) | participant | 115˙200.00 |
14 |
YASAR UNIVERSITESI
Organization address
address: UNIVERSITE CADDESI 35-37 AGACLIYOL contact info |
TR (IZMIR) | participant | 110˙640.00 |
15 |
GEOCLIMADESIGN AG
Organization address
address: MUHLENBRUCKEM 3-5 contact info |
DE (FURSTENWALDE SPREE) | participant | 95˙600.00 |
16 |
National Taiwan University of Science and Technology
Organization address
address: KEELUNG ROAD SEC4 43 contact info |
TW (Taipei) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'EcoShopping project aims to build a holistic retrofitting solution for commercial buildings to reduce primary energy consumption down to less than 80kWh/m2 per year and increase the share of RES (Renewable Energy Sources) more than 50% compared to the state of the art. The approach will be systemic by developing (1). Novel thermal insulation solutions using cost effective materials to further reduce the thermal losses and lower the energy consumption. (2). Easy to install and cascadable daylighting technologies based on the NLIS system to reduce energy billing and improve comfort. (3). HVAC Retrofitting systemic approach based on RES direct powered DC variable speed heat pump and harnessing the Building Thermal Mass for reducing the energy consumption. (4). Integrated solution way based on the Intelligent Automation Unit (IAU) concept and Mobile Robot.
The project intends to use and integrate available products and technologies along with a network of low-cost equipment to accurately monitor the environmental and occupancy parameters to have a better control of the BAM and full exploitation of the Building Thermal Mass, which serves as a “Thermal Battery” and stores the RES directly without using battery, tank or other expensive storage material and simplifying the system structure. The purpose is to reduce the energy consumption without losing comfort for users and providing, at the same time, higher energy performance, security and healthy, automatic and reliable services to visitors, building operators and owners. For this the development of the IAU and the extension of Mobile Robot plays an important role, in concept of accurate control, demand reduction, user oriented and friendly service, building security etc.'
Advanced Polymeric COmpounds and Metal Matrix Composites for Excellent Performances in Machine Tools applications
Read More