Coordinatore | CORK INSTITUTE OF TECHNOLOGY
Organization address
address: ROSSA AVENUE, BISHOPSTOWN contact info |
Nazionalità Coordinatore | Ireland [IE] |
Totale costo | 5˙417˙047 € |
EC contributo | 3˙274˙522 € |
Programma | FP7-ICT
Specific Programme "Cooperation": Information and communication technologies |
Code Call | FP7-SMARTCITIES-2013 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-10-01 - 2016-09-30 |
# | ||||
---|---|---|---|---|
1 |
CORK INSTITUTE OF TECHNOLOGY
Organization address
address: ROSSA AVENUE, BISHOPSTOWN contact info |
IE (CORK) | coordinator | 0.00 |
2 |
ACCIONA INFRAESTRUCTURAS S.A.
Organization address
address: AVENIDA DE EUROPA contact info |
ES (ALCOBENDAS) | participant | 0.00 |
3 |
ATOS SPAIN SA
Organization address
address: Calle de Albarracin contact info |
ES (Madrid) | participant | 0.00 |
4 |
IBM RESEARCH GMBH
Organization address
address: SAEUMERSTRASSE contact info |
CH (RUESCHLIKON) | participant | 0.00 |
5 |
TECHNISCHE UNIVERSITEIT EINDHOVEN
Organization address
address: DEN DOLECH contact info |
NL (EINDHOVEN) | participant | 0.00 |
6 |
UNITED TECHNOLOGIES RESEARCH CENTRE IRELAND, LIMITED
Organization address
address: FOURTH FLOOR, PENROSE BUSINESS CENTER, PENROSE WHARF, PENROS contact info |
IE (CORK) | participant | 0.00 |
7 |
UNIVERSITY COLLEGE CORK, NATIONAL UNIVERSITY OF IRELAND, CORK
Organization address
address: Western Road contact info |
IE (CORK) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
Data Centre (DC) energy consumption has doubled between 2000 and 2005 and grew by 50% from 2005 to 2010 consuming 1.5% of global energy with continued rapid growth. On average, computing consumes 60% of total energy while cooling consumes 35%. While new technology can lead to a 40% reduction computation and cooling typically operate without coordination or optimization. While server energy management can reduce energy use at CPU, rack, and DC level dynamic computation scheduling is not integrated with sensing and cooling. DC cooling typically operates at constant cold air temperature to protect the hottest server racks while local fans distribute the temperature across racks. However, these local server controls are not integrated with room cooling systems so it is not possible to optimize chiller, air fans and server fans as a system. The integration of renewable energy sources (RES) has received limited interest from the DC community due to lack of interoperability of generation, storage and heat recovery and installation and maintenance cost versus payback. The adoption of new technologies related to computing, cooling, generation, energy storage, and waste heat recovery individually requires sophisticated controls, but no single manufacturer provides a complete system so integration between control systems does not exist. To address this, GENiC will develop an integrated management and control platform for DC wide optimisation of energy consumption by integrating monitoring and control of computation, data storage, cooling, local power generation, energy storage, and waste heat recovery. The platform will include open interfaces, common data formats, control and optimisation functions and decision support to achieve a substantial reduction in energy consumption, PUE, CUE. GENiC will develop a process and tool chain for cost-effective integration of renewable energy sources into DC power systems demonstrating renewable energy penetration in excess of 80%.