Coordinatore | FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
Nazionalità Coordinatore | Spain [ES] |
Totale costo | 5˙648˙413 € |
EC contributo | 4˙351˙777 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-SMARTCITIES-2013 |
Funding Scheme | CP |
Anno di inizio | 2013 |
Periodo (anno-mese-giorno) | 2013-09-01 - 2016-02-29 |
# | ||||
---|---|---|---|---|
1 |
FUNDACION TECNALIA RESEARCH & INNOVATION
Organization address
address: PARQUE TECNOLOGICO DE MIRAMON PASEO MIKELETEGI 2 contact info |
ES (DONOSTIA-SAN SEBASTIAN) | coordinator | 632˙344.00 |
2 |
AIT Austrian Institute of Technology GmbH
Organization address
address: Donau-City-Strasse 1 contact info |
AT (WIEN) | participant | 635˙658.00 |
3 |
DANMARKS TEKNISKE UNIVERSITET
Organization address
address: Anker Engelundsvej 1, Building 101A contact info |
DK (KONGENS LYNGBY) | participant | 586˙787.00 |
4 |
RICERCA SUL SISTEMA ENERGETICO - RSE SPA
Organization address
address: Via Rubattino Raffaele 54 contact info |
IT (MILANO) | participant | 437˙714.00 |
5 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 435˙933.00 |
6 |
POLITECHNIKA LODZKA
Organization address
address: ULICA ZEROMSKIEGO 116 contact info |
PL (LODZ) | participant | 411˙480.00 |
7 |
European Distributed Energy Resources Laboratories e.V.
Organization address
city: Kassel contact info |
DE (Kassel) | participant | 409˙016.00 |
8 |
NEDERLANDSE ORGANISATIE VOOR TOEGEPAST NATUURWETENSCHAPPELIJK ONDERZOEK TNO
Organization address
address: Schoemakerstraat 97 contact info |
NL (DEN HAAG) | participant | 403˙582.00 |
9 |
ETREL SVETOVANJE IN DRUGE STORITVE DOO
Organization address
address: UKMARJEVA ULICA 2 contact info |
SI (LJUBLJANA) | participant | 145˙512.00 |
10 |
ALTRA SPA
Organization address
address: Via Adamoli Gelasio 237 F-G contact info |
IT (Genova) | participant | 144˙095.00 |
11 |
Zapadoslovenska Distribucna as
Organization address
address: Culenova 6 contact info |
SK (Bratislava 1) | participant | 109˙656.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'In order to promote the widespread adoption of electric vehicles (EV) in Europe and to reduce the different regulatory, commercial or political barriers, it is imperative that EVs, Charging Points (CPs) and all kind of systems needed to allow the charging and other additional services are compatible to some extent. EVs emerge as a great challenge for the grid infrastructure. During the last years most OEMs are producing new EV series, which are slowly spreading in the market. In parallel, intelligent systems of very different functionalities and technologies, aim to open new markets of added value services. The performance and interoperability of all those systems need to be assessed from different perspectives, including electric energy, communications and information management. This way, the whole system will be able to offer charging and other services, which will allow the creation of sustainable new business models. COTEVOS considers all these needs, and verifies the functionalities that the different systems require to manage the EV charging and the associated smart grid infrastructure. COTEVOS aims to develop optimal structures and capacities to test the conformance, interoperability and performance of the different systems to be included in the infrastructure for smart charging of Electric Vehicles. Based on the partners’ contrasted experience and a decade of collaboration around the facilities, standardization and research infrastructures for DER and aligned with ongoing standardization development under M/453, M/468 and M/490 (CENELEC SG-CG, E-Mobility Smart Charging WG among others), COTEVOS will address key issues such as the cross-national transparency, the interaction between grid infrastructure and vehicles and the operational reliability, while reducing the time-to-market of equipments, so that they will be available in line with the arrival of electric vehicle. For that purpose, a number of on-going demo projects will be used as a reference.'