Coordinatore | TRACTEBEL ENGINEERING S.A.
Organization address
address: Avenue Ariane 7 contact info |
Nazionalità Coordinatore | Belgium [BE] |
Totale costo | 13˙593˙188 € |
EC contributo | 8˙622˙027 € |
Programma | FP7-ENERGY
Specific Programme "Cooperation": Energy |
Code Call | FP7-ENERGY-2007-1-RTD |
Funding Scheme | CP-IP |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-07-01 - 2012-06-30 |
# | ||||
---|---|---|---|---|
1 |
TRACTEBEL ENGINEERING S.A.
Organization address
address: Avenue Ariane 7 contact info |
BE (BRUSSELS) | coordinator | 0.00 |
2 |
"ASOCIACION DE LA INVESTIGACION Y COOPERACION INDUSTRIAL DE ANDALUCIA ""F. DE PAULA ROJAS"""
Organization address
address: CAMINO DE LOS DESCUBRIMIENTOS S/N ESCUELA SUPERIOR DE INGENI contact info |
ES (SEVILLA) | participant | 0.00 |
3 |
AB LIETUVOS ENERGIJA
Organization address
address: Zveju contact info |
LT (VILNIUS) | participant | 0.00 |
4 |
CENTRALE RECHERCHE SA
Organization address
address: Rue Jean Goujon 8 contact info |
FR (PARIS) | participant | 0.00 |
5 |
COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE TRANSELECTRICA SA
Organization address
address: "Bd. General Gherorghe Magheru 33, sectorul 1" contact info |
RO (BUCURESTI) | participant | 0.00 |
6 |
DELING DOO
Organization address
address: SICI BB contact info |
BA (TUZLA) | participant | 0.00 |
7 |
ELIA SYSTEM OPERATOR
Organization address
address: BOULEVARD DE L'EMPEREUR 20 contact info |
BE (BRUXELLES) | participant | 0.00 |
8 |
FCS DIGITEO TRIANGLE DE LA PHYSIQUE
Organization address
city: SAINT AUBIN contact info |
FR (SAINT AUBIN) | participant | 0.00 |
9 |
FORSCHUNGSGEMEINSCHAFT FUER ELEKTRISCHE ANLAGEN UND STROMWIRTSCHAFT E.V.
Organization address
address: HALLENWEG 40 contact info |
DE (MANNHEIM) | participant | 0.00 |
10 |
HEP - OPERATOR PRIJENOSNOG SUSTAVA d.o.o.
Organization address
address: Kupska 4 contact info |
HR (Zagreb) | participant | 0.00 |
11 |
INSTITUT NATIONAL DE RECHERCHE EN INFORMATIQUE ET EN AUTOMATIQUE
Organization address
address: Domaine de Voluceau, Rocquencourt contact info |
FR (LE CHESNAY Cedex) | participant | 0.00 |
12 |
LITGRID AB
Organization address
address: A JUOZAPAVICIAUS G 13 contact info |
LT (VILNIUS) | participant | 0.00 |
13 |
NUCLEO DE COMUNICACIONES Y CONTROL SL
Organization address
address: CALLE SERRANO 57 contact info |
ES (MADRID) | participant | 0.00 |
14 |
RED ELECTRICA CORPORACION SA
Organization address
address: PASEO DEL CONDE DE LOS GAITANES 177 contact info |
ES (ALCOBENDAS - MADRID) | participant | 0.00 |
15 |
RED ELECTRICA DE ESPANA S.A.U.
Organization address
address: PASEO DEL CONDE DE LOS GAITANES 177 contact info |
ES (ALCOBENDAS - MADRID) | participant | 0.00 |
16 |
REN - REDE ELECTRICA NACIONAL S.A.
Organization address
address: "AVENIDA ESTADOS UNIDOS DA AMERICA, 55 - 20" contact info |
PT (LISBOA) | participant | 0.00 |
17 |
RIGAS TEHNISKA UNIVERSITATE
Organization address
address: KALKU IELA 1 contact info |
LV (RIGA) | participant | 0.00 |
18 |
RTE RESEAU DE TRANSPORT D ELECTRICITE SA
Organization address
address: Terrasse Bellini 1 Tour Initiale contact info |
FR (LA DEFENSE CEDEX) | participant | 0.00 |
19 |
System Operator-Central Dispatch Administration of the Unified Energy System
Organization address
address: Kitaigorodskiy proezd 7/3 contact info |
RU (Moscow) | participant | 0.00 |
20 |
TECHNISCHE UNIVERSITEIT EINDHOVEN
Organization address
address: DEN DOLECH 2 contact info |
NL (EINDHOVEN) | participant | 0.00 |
21 |
THE DESIGN & RESEARCH INSTITUTE OF POWER SYSTEMS AND NETWORKS ENERGOSETPROJECT
Organization address
address: Tkatskaya contact info |
RU (MOSCOW) | participant | 0.00 |
22 |
THE UNIVERSITY OF MANCHESTER
Organization address
address: OXFORD ROAD contact info |
UK (MANCHESTER) | participant | 0.00 |
23 |
TURKIYE ELEKTRIK ILETIM ANONIM SIRKETI
Organization address
address: Inonu Bulvari 27 contact info |
TR (Bahcelievler - ANKARA) | participant | 0.00 |
24 |
UNIVERSITAET DUISBURG-ESSEN
Organization address
address: UNIVERSITAETSSTRASSE 2 contact info |
DE (ESSEN) | participant | 0.00 |
25 |
UNIVERSITE DE LIEGE
Organization address
city: LIEGE contact info |
BE (LIEGE) | participant | 0.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimization and simulation frameworks, their performance and dataflow requirements to achieve an integrated security analysis and control of the ETN. The heart of the PEGASE project will involve advanced algorithmic, build prototypes of software and demonstrate the feasibility of real-time state estimation (SE), multi purpose constrained optimization (OPF) and time domain simulation of very large model representative of the ETN, taking into account its operation by multiple TSOs. Project R&D ambitions: The first ambition is to relieve all knowledge barriers to provide all TSOs with a synchronous display of the state of the ETN, very close to real time (typically each 5-10 seconds). The second ambition is to develop OPF programs determining realistic system operating points that include TSO operating rules but also optimal preventive or corrective actions, typically for real-time congestion management. The third ambition is to improve the existing state of the art technology in time simulation of very large system to permit: i/ off-line studies of the ETN including possibly interconnections with neighboring systems (i.e. Russia), ii/ dispatcher training simulation iii/ preventive security assessment and in on-line emergency conditions, faster than real-time simulation opening new perspectives for an anticipative control of the system. Project expected impacts: The availability of duly tested prototypes will allow for a quick implementation of the developed tools in a central facility and in existing computing environments. A better management of crisis will allow decreasing conservative security margins and improving the identification of real risks. Operating with higher power flows and closer to real available transfer capacities determined more transparently from the shared real-time model will enhance the cross-border electricity market. Eventually, the first European dispatcher training simulator will be at arm length for use in a European training center allowing the simultaneous training of dispatchers from several countries that is the cornerstone of the integrated operation of the ETN.'
The EU plans to complete its ambitious single market in energy by 2014. A European research project has come up with advanced algorithms and models to help network operators manage the cross-border flow of electricity efficiently, reliably and sustainably.