Coordinatore | COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
Nazionalità Coordinatore | France [FR] |
Totale costo | 3˙421˙446 € |
EC contributo | 1˙750˙000 € |
Programma | FP7-EURATOM-FISSION
EURATOM: Nuclear fission and radiation protection |
Code Call | FP7-Fission-2007 |
Funding Scheme | CP |
Anno di inizio | 2009 |
Periodo (anno-mese-giorno) | 2009-01-01 - 2010-03-31 |
# | ||||
---|---|---|---|---|
1 |
COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
FR (PARIS 15) | coordinator | 713˙311.00 |
2 |
EQUIPOS NUCLEARES SA
Organization address
address: Jose Ortega y Gasset 20 contact info |
ES (MADRID) | participant | 539˙043.00 |
3 |
EMPRESARIOS AGRUPADOS INTERNACIONA L SA
Organization address
address: CALLE MAGALLANES 3 contact info |
ES (MADRID) | participant | 270˙268.00 |
4 |
CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT
Organization address
address: Avenida Complutense 22 contact info |
ES (MADRID) | participant | 107˙995.00 |
5 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 47˙146.00 |
6 |
STUDIECENTRUM VOOR KERNENERGIE
Organization address
address: Herrmann Debrouxlaan 40 contact info |
BE (Brussel) | participant | 41˙012.00 |
7 |
USTAV JADERNEHO VYZKUMU REZ A.S.
Organization address
address: HUSINEC - REZ 130 contact info |
CZ (HUSINEC) | participant | 31˙225.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The present proposal addresses the support to the Jules Horowitz Material testing reactor, a new research infrastructure of pan-European interest (Topic Fission-2007-4.1.2). In the EURATOM field of fission, the Jules Horowitz Reactor (JHR) appears to be an innovative project (FEUNMARR & ESFRI), firstly from the technical point of view as an up-to-date high performance material testing reactor (MTR), secondly through a funding and steering structure gathering several European research institutes and industrial companies. The overall JHR project that encompasses the JHR design and construction is generally designates as the “JHR project”. In the following “JHR-CP” designates the 7th FP Collaborative Project proposed as a contribution to the overall JHR project. The JHR-CP project will include several networking activities related to : - the management of the project, - the organizational aspects of the experimental processes attached to this experimental reactor, - the training, with the definition of academic and professional training related to the specific JHR experimentation and operation needs based on the best European practices. In the same way the JHR-CP project will include several Technical activities related to the JHR design and construction. Those activities are concerning more specifically : - the qualification programme of the critical components of the reactor, - the qualification tests of specific components, - the man machine interface principle’s definition, - the safety analysis and actions, the definition of some supports to JHR experimentation.'