Coordinatore | CENTRO RICERCHE FIAT SCPA
Organization address
address: Strada Torino 50 contact info |
Nazionalità Coordinatore | Italy [IT] |
Sito del progetto | http://www.ingas-eu.org/about.php |
Totale costo | 21˙337˙191 € |
EC contributo | 12˙116˙970 € |
Programma | FP7-TRANSPORT
Specific Programme "Cooperation": Transport (including Aeronautics) |
Code Call | FP7-SST-2007-RTD-1 |
Funding Scheme | CP-IP |
Anno di inizio | 2008 |
Periodo (anno-mese-giorno) | 2008-10-01 - 2012-03-31 |
# | ||||
---|---|---|---|---|
1 |
CENTRO RICERCHE FIAT SCPA
Organization address
address: Strada Torino 50 contact info |
IT (ORBASSANO) | coordinator | 2˙309˙939.20 |
2 |
AVL LIST GMBH
Organization address
address: HANS-LIST-PLATZ 1 contact info |
AT (GRAZ) | participant | 1˙572˙554.00 |
3 |
FEV GMBH
Organization address
address: Neuenhofstrasse 181 contact info |
DE (AACHEN) | participant | 1˙097˙801.90 |
4 |
DAIMLER AG
Organization address
address: MERCEDESSTRASSE 137 contact info |
DE (STUTTGART) | participant | 825˙372.00 |
5 |
IFP Energies nouvelles
Organization address
address: AVENUE DE BOIS PREAU 1 & 4 contact info |
FR (RUEIL MALMAISON) | participant | 486˙800.00 |
6 |
SIEMENS AKTIENGESELLSCHAFT
Organization address
address: Wittelsbacherplatz 2 contact info |
DE (MUNCHEN) | participant | 426˙500.00 |
7 |
ECOCAT OY
Organization address
address: Vihtavuorentie 162 contact info |
FI (VIHTAVUORI) | participant | 398˙325.00 |
8 |
Continental Automotive GmbH
Organization address
address: VAHRENWALDER STRASSE 9 contact info |
DE (HANNOVER) | participant | 368˙006.00 |
9 |
XPERION ENERGY & ENVIRONMENT GMBH
Organization address
address: PLANCKSTRASSE 15 contact info |
DE (HERFORD) | participant | 366˙400.00 |
10 |
BUNDESANSTALT FUER MATERIALFORSCHUNG UND -PRUEFUNG
Organization address
address: Unter den Eichen 87 contact info |
DE (BERLIN) | participant | 363˙900.00 |
11 |
VENTREX AUTOMOTIVE GMBH
Organization address
address: Johann Sebastian Bach Gasse 1 contact info |
AT (GRAZ) | participant | 357˙411.00 |
12 |
UNIVERSITAET STUTTGART
Organization address
address: Keplerstrasse 7 contact info |
DE (STUTTGART) | participant | 305˙476.00 |
13 |
E. ON RUHRGAS AG
Organization address
city: ESSEN contact info |
DE (ESSEN) | participant | 291˙405.00 |
14 |
INSTYTUT KATALIZY I FIZYKOCHEMII POWIERZCHNI IM. JERZEGO HABERA POLSKA AKADEMIA NAUK
Organization address
address: UL. NIEZAPOMINAJEK 8 contact info |
PL (KRAKOW) | participant | 275˙400.00 |
15 | SAAB AUTOMOBILE POWERTRAIN AB | SE | participant | 267˙424.50 |
16 |
POLITECNICO DI MILANO
Organization address
address: PIAZZA LEONARDO DA VINCI 32 contact info |
IT (MILANO) | participant | 245˙100.00 |
17 |
ADAM OPEL GMBH
Organization address
address: FRIEDRICH LUTZMANN RING 1 contact info |
DE (RUESSELSHEIM) | participant | 235˙836.00 |
18 |
RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN
Organization address
address: Templergraben 55 contact info |
DE (AACHEN) | participant | 229˙729.20 |
19 |
GDF SUEZ
Organization address
address: PLACE SAMUEL DE CHAMPLAIN 1 contact info |
FR (COURBEVOIE) | participant | 189˙531.00 |
20 |
TECHNISCHE UNIVERSITAET GRAZ
Organization address
address: Rechbauerstrasse 12 contact info |
AT (GRAZ) | participant | 161˙256.00 |
21 |
HALDOR TOPSOE AS
Organization address
address: Nymoellevej 55 contact info |
DK (LYNGBY) | participant | 160˙000.00 |
22 |
CHALMERS TEKNISKA HOEGSKOLA AB
Organization address
address: - contact info |
SE (GOETEBORG) | participant | 150˙120.00 |
23 |
POLITECNICO DI TORINO
Organization address
address: Corso Duca degli Abruzzi 24 contact info |
IT (TORINO) | participant | 150˙000.00 |
24 |
CONSIGLIO NAZIONALE DELLE RICERCHE
Organization address
address: Piazzale Aldo Moro 7 contact info |
IT (ROMA) | participant | 149˙100.00 |
25 |
CESKE VYSOKE UCENI TECHNICKE V PRAZE
Organization address
address: ZIKOVA 4 contact info |
CZ (PRAHA) | participant | 148˙635.00 |
26 |
POLITECHNIKA WROCLAWSKA
Organization address
address: WYBRZEZE WYSPIANSKIEGO 27 contact info |
PL (WROCLAW) | participant | 135˙000.00 |
27 |
Katcon Global SA
Organization address
address: Avenue de Luxembourg 21 contact info |
LU (Bascharage) | participant | 124˙484.00 |
28 |
DELPHI AUTOMOTIVE SYSTEMS LUXEMBOURG SA
Organization address
address: Avenue de Luxembourg contact info |
LU (BASCHARAGE) | participant | 121˙473.00 |
29 |
General Motors Powertrain - Germany GmbH
Organization address
address: Bahnhofsplatz 1 contact info |
DE (Ruesselsheim) | participant | 104˙092.00 |
30 |
MEMS AG-MATTER ENGINEERING FOR METERING SYSTEMS
Organization address
address: REBMOOSWEG 29A contact info |
CH (BRUGG) | participant | 99˙900.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'Main objective of “Integrated gas powertrain (InGas)” Collaborative Project is to deploy a custom designed engine integrated with specific aftertreatment systems applied to a light duty vehicle able to achieve a 10% higher fuel conversion efficiency than that of a corresponding 2006 diesel vehicle and complying with an emission level lower than Euro 6. Additional features are advanced storage systems and vehicle architectures, as well as multi-grade fuel tolerance and fuel flexibility. To achieve the InGas targets, three main combustion technologies will be compared: Sub-Project A1 “CNG technologies for passenger cars” will develop a natural gas car powered by a 1.4 liter displacement engine using the sequential multi-point port gas injection and following the stoichiometric approach; Sub-Project A2 “Turbo DI CNG engine” will develop a natural gas car powered by a 1.8 liter displacement engine using the direct gas in-cylinder injection and following a lean burn approach; Sub-Project A3 “Boosted lean burn gas engine” will develop a natural gas light-duty vehicle powered by a 1.9 liter displacement engine using port gas injection or low pressure direct gas injection and following the ultra-lean combustion approach. Three main enabling technologies will be compared and assessed Sub-Project B0 “Fuels for advanced CNG engines” will define / supply the gas mixture of the requested quality, conduct analysis and propose solutions in order to affect in a flexible way storage, combustion, aftertreatment and performance of the CNG vehicles; Sub-Project B1 “Gas storage for passenger car CNG engine” will develop advanced gas storage and filling systems including specific components and gas sensors; Sub-Project B2 “Aftertreatment for passenger car CNG engine” will develop an aftertreatment system for natural gas vehicles having special regards to CH4 conversion efficiency and NOx abatement under stoichiometric and lean combustion operations.'