Opendata, web and dolomites

IN2RAIL SIGNED

Innovative Intelligent Rail

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 IN2RAIL project word cloud

Explore the words cloud of the IN2RAIL project. It provides you a very rough idea of what is the project "IN2RAIL" about.

migration    automated    blocks    capability    losses    optimise    fulfilling    fundamental    utilise    interfaces    shared    reliability    i2m    rams    degradation    switches    adding    modern    accurate    connected    inter    legacy    root    intelligent    statuses    scalable    characterised    techniques    competitiveness    infrastructures    flows    demands    forecasting    utilising    status    efficient    infrastructure    exists    exploited    network    traffic    service    meeting    reducing    in2rail    building    data    quality    framework    foundations    mobility    power    engineering    nowcasting    solutions    researches    capacity    rail    risk    critical    holistic    delivering    lean    resilient    unlock    components    innovation    tracks    innovative    wealth    ing    lcc    maintenance    balancing    consistent    causes    performance    created    shift2rail    create    explored    standardised    interoperable    energy    supply    railway    smart    upgradable    asset    tackle    demand    precise    crossings    estimates    technologies    assets   

Project "IN2RAIL" data sheet

The following table provides information about the project.

Coordinator
NETWORK RAIL INFRASTRUCTURE LIMITED 

Organization address
address: 1 EVERSHOLT STREET
city: LONDON
postcode: NW1 2DN
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 17˙998˙546 €
 EC max contribution 17˙998˙546 € (100%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
 Code Call H2020-MG-2014_TwoStages
 Funding Scheme RIA
 Starting year 2015
 Duration (year-month-day) from 2015-05-01   to  2018-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NETWORK RAIL INFRASTRUCTURE LIMITED UK (LONDON) coordinator 1˙441˙167.00
2    SIEMENS AKTIENGESELLSCHAFT DE (MUNCHEN) participant 1˙571˙118.00
3    HITACHI RAIL STS SPA IT (GENOVA) participant 1˙300˙734.00
4    RINA CONSULTING SPA IT (GENOVA) participant 699˙250.00
5    TRAFIKVERKET - TRV SE (BORLANGE) participant 680˙424.00
6    HACON INGENIEURGESELLSCHAFT MBH DE (HANNOVER) participant 666˙577.00
7    BOMBARDIER TRANSPORTATION SWEDEN AB SE (VASTERAS) participant 633˙887.00
8    CHALMERS TEKNISKA HOEGSKOLA AB SE (GOETEBORG) participant 630˙803.00
9    LULEA TEKNISKA UNIVERSITET SE (LULEA) participant 533˙481.00
10    STRUKTON RAIL BV NL (UTRECHT) participant 471˙082.00
11    MER MEC SPA IT (MONOPOLI) participant 462˙778.00
12    SNCF MOBILITES FR (ST DENIS) participant 461˙937.00
13    DEUTSCHE BAHN AG DE (BERLIN) participant 461˙625.00
14    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV DE (KOELN) participant 453˙902.00
15    ALSTOM TRANSPORT SA FR (SAINT OUEN) participant 405˙400.00
16    ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS ES (MADRID) participant 400˙000.00
17    COMSA INSTALACIONES Y SISTEMAS INDUSTRIALES SA ES (BARCELONA) participant 380˙250.00
18    THALES SIX GTS FRANCE SAS FR (GENNEVILLIERS) participant 375˙312.00
19    UNIVERSITY OF HUDDERSFIELD UK (HUDDERSFIELD) participant 360˙285.00
20    UNIVERSITY OF SOUTHAMPTON UK (SOUTHAMPTON) participant 338˙293.00
21    RETE FERROVIARIA ITALIANA IT (ROMA) participant 319˙868.00
22    UNIVERSITY OF BRISTOL UK (BRISTOL) participant 289˙687.00
23    RAILENIUM FR (FAMARS) participant 286˙980.00
24    EMBEDDED RAIL TECHNOLOGY LTD UK (DERBY) participant 286˙281.00
25    SYSTRA SA FR (PARIS) participant 279˙984.00
26    DOTVISION FR (MOISSY CRAMAYEL) participant 264˙289.00
27    IZT INSTITUT FUER ZUKUNFTSSTUDIEN UND TECHNOLOGIEBEWERTUNG GEMEINNUTZIGE GMBH DE (BERLIN) participant 250˙000.00
28    INSTITUT DE RECHERCHE TECHNOLOGIQUE SYSTEMX FR (PALAISEAU) participant 240˙000.00
29    UNIVERSITA DEGLI STUDI DI GENOVA IT (GENOVA) participant 213˙431.00
30    CAF SIGNALLING S.L ES (SAN SEBASTIAN) participant 205˙167.00
31    FCC CONSTRUCCION SA ES (BARCELONA) participant 201˙997.00
32    RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN DE (AACHEN) participant 200˙000.00
33    POLITECNICO DI MILANO IT (MILANO) participant 199˙862.00
34    THE UNIVERSITY OF NOTTINGHAM UK (NOTTINGHAM) participant 196˙287.00
35    NEELOGY FR (SAINT-AVERTIN) participant 191˙252.00
36    LOUGHBOROUGH UNIVERSITY UK (LOUGHBOROUGH) participant 187˙087.00
37    UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE BE (BRUXELLES) participant 165˙687.00
38    THE UNIVERSITY OF BIRMINGHAM UK (BIRMINGHAM) participant 164˙120.00
39    ACCIONA CONSTRUCCION SA ES (ALCOBENDAS) participant 152˙468.00
40    AZD PRAHA SRO CZ (PRAHA) participant 150˙000.00
41    GRIDNET S.A. EL (NEA SMYRNI) participant 100˙000.00
42    VIRTUAL VEHICLE RESEARCH GMBH AT (GRAZ) participant 96˙281.00
43    FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. DE (MUNCHEN) participant 92˙125.00
44    OBB-Infrastruktur AG AT (WIEN) participant 87˙225.00
45    UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA IT (ROMA) participant 69˙896.00
46    INDRA SISTEMAS SA ES (ALCOBENDAS MADRID) participant 68˙000.00
47    EUROPEAN FEDERATION OF RAILWAYS TRACKWORKS CONTRACTORS LU (PETANGE) participant 62˙812.00
48    EVOLEO TECHNOLOGIES LDA PT (MAIA) participant 60˙156.00
49    UNIVERSIDADE DO PORTO PT (PORTO) participant 60˙062.00
50    3DELING SP ZOO PL (KRAKOW) participant 30˙000.00
51    SYGNITY SPOLKA AKCYJNA PL (WARSZAWA) participant 30˙000.00
52    VOSSLOH COGIFER FR (RUEIL MALMAISON) participant 27˙137.00
53    INGENIERIA Y ECONOMIA DEL TRANSPORTE SME MP SA ES (MADRID) participant 22˙015.00
54    TATA STEEL FRANCE RAIL SA FR (HAYANGE) participant 20˙070.00

Map

 Project objective

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineering are integrated, optimised, shared and exploited. IN2RAIL will make advances towards SHIFT2RAIL objectives: enhancing the existing capacity fulfilling user demand; increasing the reliability delivering better and consistent quality of service; reducing the LCC increasing competitiveness of the EU rail system. To achieve the above, a holistic approach covering Smart Infrastructures, Intelligent Mobility Management (I2M)and Rail Power Supply and Energy Management will be applied. Smart Infrastructure addresses the fundamental design of critical assets - switches and crossings and tracks. It will research components capable of meeting future railway demands and will utilise modern technologies in the process. Risk and condition-based LEAN approaches to optimise RAMS and LCC in asset maintenance activities will be created to tackle the root causes of degradation. I2M researches automated, interoperable and inter-connected advanced traffic management systems; scalable and upgradable systems, utilising standardised products and interfaces, enabling easy migration from legacy systems; the wealth of data and information on assets and traffic status; information management systems adding the capability of nowcasting and forecasting of critical asset statuses. Rail Power Supply and Energy Management create solutions to improve the energy performance of the railway system. Research on new power systems characterised by reduced losses and capable of balancing energy demands, along with innovative energy management systems enabling accurate and precise estimates of energy flows.

 Deliverables

List of deliverables.
Interface Control Document (ICD) for Application-specific Interfaces Documents, reports 2020-02-07 15:08:38
Investigation of repair methods and welding techniques Documents, reports 2020-02-07 15:08:41
Asset status forecasting and feature selection methodologies Documents, reports 2020-02-07 15:08:40
IN²RAIL Video Websites, patent fillings, videos etc. 2020-02-07 15:08:41
Development of novel S&C motion mechanisms:- Design concept report [TRL 3] Documents, reports 2020-02-07 15:08:37
Final research report “Intelligent AC power supply” Documents, reports 2020-02-07 15:08:40
Integration and Implementation Design – Link to SHIFT2RAIL Documents, reports 2020-02-07 15:08:38
Radical S&C concept:- Design concept evaluation study report [TRL3] Documents, reports 2020-02-07 15:08:40
Definition of the Proof-of-concept Documents, reports 2020-02-07 15:08:37
Interface Control Document for Integration Layer Interfaces, external/Web interfaces and Dynamic Demand Service Documents, reports 2020-02-07 15:08:38
Nowcasting methodologies Documents, reports 2020-02-07 15:08:38
Quality Assurance Report Documents, reports 2020-02-07 15:08:40
Integration Test Plan for Application Framework and Constituents Documents, reports 2020-02-07 15:08:38
Prioritised relevant input Documents, reports 2020-02-07 15:08:37
Dissemination and Exploitation activities Websites, patent fillings, videos etc. 2020-02-07 15:08:41
Self inspecting / adjusting S&C:- Systems concept design report [TRL5] Documents, reports 2020-02-07 15:08:41
Evaluation of the proof of concept Documents, reports 2020-02-07 15:08:37
TMS/MMS interface specification Documents, reports 2020-02-07 15:08:41
Asset status representation Documents, reports 2020-02-07 15:08:38
Embedded & integrated sensors:- Systems design hierarchy report [TRL5] Documents, reports 2020-02-07 15:08:38
Description of Integration Layer and Constituents Documents, reports 2020-02-07 15:08:37
Requirements for Interfaces Documents, reports 2020-02-07 15:08:37
Description of the Generic Application Framework and its constituents Documents, reports 2020-02-07 15:08:38
Report on key parameters for bridge and tunnel inspections Documents, reports 2020-02-07 15:08:37
Report on benchmark, evaluation and initial test Documents, reports 2020-02-07 15:08:37
System Integration Report Documents, reports 2020-02-07 15:08:40
Report on technical validation of concepts and models [TRL 5] Documents, reports 2020-02-07 15:08:37
Requirements for the Generic Application Framework Documents, reports 2020-02-07 15:08:37
Set up public website Websites, patent fillings, videos etc. 2020-02-07 15:08:36
Mid term System Integration Report Documents, reports 2020-02-07 15:08:36
Set up a dissemination and exploitation plan for IN²RAIL Websites, patent fillings, videos etc. 2020-02-07 15:08:37
Quality Plan (WP1) Documents, reports 2020-02-07 15:08:37
Embedded & integrated sensors:- Systems design selection report [TRL5] Documents, reports 2020-02-07 15:08:37
Quality Plan Documents, reports 2020-02-07 15:08:36
Requirements for the Integration Layer Documents, reports 2020-02-07 15:08:36
I2M Consolidated Functional and Non-Functional Requirements Documents, reports 2020-02-07 15:08:36
Specifications of the Standard Operator Workstation Documents, reports 2020-02-07 15:08:36
Project Manual Documents, reports 2020-02-07 15:08:36
I2M State-of-the-art and High Level Requirements Documents, reports 2020-02-07 15:08:36

Take a look to the deliverables list in detail:  detailed list of IN2RAIL deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Nabilah Farhat, Christopher P. Ward, Roger M. Goodall, Roger Dixon
The benefits of mechatronically-guided railway vehicles: A multi-body physics simulation study
published pages: 115-126, ISSN: 0957-4158, DOI: 10.1016/j.mechatronics.2018.03.008
Mechatronics 51 2020-02-07
2016 Oneto L., Fumeo E., Clerico G., Anguita D., Canepa R., Papa F., Dambra C. and Mazzino N.
Advanced Analytics for Delay Prediction Systems in Railway Networks by Including Exogenous Weather Data
published pages: , ISSN: , DOI:
IEEE International Conference on Data Science and Advanced Analytics (DSAA) 2016 2020-02-07
2016 Fumeo E., Anguita D., Galar D., Mazzino N., Milani C., Dambra C.
Asset Status Nowcasting and Forecasting in Integrated Railway Systems
published pages: , ISSN: , DOI:
WCR2016 Paper 2020-02-07
2016 Oneto L., Fumeo E., Clerico G., Anguita D., Canepa R., Papa F., Dambra C. and Mazzino N.
Delay Prediction System for Large-Scale Railway Networks based on Big Data Analytics
published pages: , ISSN: , DOI:
INNS Big Data Conference 2016 2020-02-07
2016 Björn Pålsson
Kinematic Principles in Switches & Crossings
published pages: , ISSN: , DOI:
2020-02-07
2015 Manuel Alfageme
Key on-going railways energy efficiency innovations
published pages: , ISSN: , DOI:
2020-02-07
2018 C. Fecarotti and J. Andrews
Producing an effective maintenance strategy to control railway risk
published pages: , ISSN: , DOI:
PSAM14 2018 2020-02-07
2016 Amanda Webster, Roberto Bianchi
In2Rail
published pages: , ISSN: , DOI:
2020-02-07
2017 J.C.O. Nielsen, E.G. Berggren, A. Hammar, F. Jansson, and R. Bolmsvik
Track geometry degradation on the Swedish heavy haul line – correlation between measured support stiffness gradients and differential settlement
published pages: 542-549, ISSN: , DOI:
Proceedings 11th International Heavy Haul Conference 2020-02-07
2018 S. Dutta, T. Harrison, C. Ward, R. Dixon and T. Scott
A new approach to railway track switch actuation: Dynamic simulation and control of a self-adjusting switch
published pages: , ISSN: , DOI:
Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 2020-02-07
2016 Roberto Bianchi
Power supply and the internet of things
published pages: , ISSN: , DOI:
2020-02-07
2018 N. Farhat, C. P. Ward, R. M. Goodall, R. Dixon
Benefits of mechatronically-guided vehicles on railway track switches
published pages: , ISSN: , DOI:
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 2020-02-07
2016 Oneto L., Fumeo E., Clerico G., Anguita D., Canepa R., Papa F., Dambra C. and Mazzino N.
Advanced Analytics for Train Delay Prediction Systems by Including Exogenous Weather Data
published pages: , ISSN: , DOI:
IEEE International Conference on Data Science and Advanced Analytics (DSAA) 2016 2020-02-07
2018 Anders Ekberg, Elena Kabo, Michele Maglio
Rolling contact fatigue assessment of rail welds with application to repair welding
published pages: , ISSN: , DOI:
Contact mechanics and wear of rail/wheel systems 2018 2020-02-07
2018 C. Fecarotti and J. Andrews
Reliability Engineering and System Safety
published pages: , ISSN: , DOI:
Reliability Engineering and System Safety 2020-02-07
2018 Björn A Pålsson
A linear wheel–crossing interaction model
published pages: 95440971877298, ISSN: 0954-4097, DOI: 10.1177/0954409718772984
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 2020-02-07
2018 Luca Oneto, Emanuele Fumeo, Giorgio Clerico, Renzo Canepa, Federico Papa, Carlo Dambra, Nadia Mazzino, Davide Anguita
Train Delay Prediction Systems: A Big Data Analytics Perspective
published pages: 54-64, ISSN: 2214-5796, DOI: 10.1016/j.bdr.2017.05.002
Big Data Research 11 2020-02-07
2016 E. Fumeo, D. Anguita, D. Galar, N. Mazzino and C. Milani
Asset Status Nowcasting and Forecasting in Integrated Railway Systems
published pages: , ISSN: , DOI:
World Congress on Railway Research 2020-02-07
2016 Markos P. Anastasopoulos, Anna Tzanakaki, Dimitra Simeonidou
Scalable Monitoring and Optimization Techniques for Megascale Data Centers
published pages: 1980-1989, ISSN: 0733-8724, DOI: 10.1109/JLT.2016.2522654
Journal of Lightwave Technology 34/8 2020-02-07
2017 Luca Oneto, Emanuele Fumeo, Giorgio Clerico, Renzo Canepa, Federico Papa, Carlo Dambra, Nadia Mazzino, Davide Anguita
Dynamic Delay Predictions for Large-Scale Railway Networks: Deep and Shallow Extreme Learning Machines Tuned via Thresholdout
published pages: 2754-2767, ISSN: 2168-2216, DOI: 10.1109/TSMC.2017.2693209
IEEE Transactions on Systems, Man, and Cybernetics: Systems 47/10 2020-02-07
2016 Roberto Bianchi
In2Rail – The Digital Substation
published pages: , ISSN: , DOI:
2020-02-07
2018 Emanuele Fumeo, Luca Oneto, Giorgio Clerico, Renzo Canepa, Federico Papa, Carlo Dambra, Nadia Mazzino, Davida Anguita
Big Data Analytics for Train Delay Prediction: A case study in the Italian Railway Network
published pages: 320-348, ISSN: , DOI: 10.4018/978-1-5225-3176-0.ch014
2020-02-07
2018 P. T. Torstensson, G. Squicciarini, M. Krüger, Jens C. O. Nielsen, David J. Thompson
Hybrid model for prediction of impact noise generated at railway crossings
published pages: 759-769, ISSN: , DOI: 10.1007/978-3-319-73411-8_60
2020-02-07
2016 P.T. Torstensson, G. Squicciarini, M. Krüger, J.C.O. Nielsen, D.J. Thompson
Hybrid model for prediction of impact noise generated at railway crossings
published pages: , ISSN: , DOI:
2020-02-07
2016 Luca Oneto, Emanuele Fumeo, Giorgio Clerico, Renzo Canepa, Federico Papa, Carlo Dambra, Nadia Mazzino, Davide Anguita
Delay Prediction System for Large-Scale Railway Networks based on Big Data Analytics
published pages: 139-150, ISSN: , DOI: 10.1007/978-3-319-47898-2_15
2020-02-07

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IN2RAIL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "IN2RAIL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.)

GREAT (2020)

Greener Air Traffic Operations

Read More  

ALTERNATE (2020)

ASSESSMENT ON ALTERNATIVE AVIATION FUELS DEVELOPMENT

Read More  

GVI (2019)

Green Vehicle Index Project

Read More