Opendata, web and dolomites

tCat SIGNED

Disrupting the rail maintenance sector thanks to the most cost-efficient solution to auscultate railways overhead lines reducing costs up to 80%

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 tCat project word cloud

Explore the words cloud of the tCat project. It provides you a very rough idea of what is the project "tCat" about.

captured    market    lower    trolley    profitability    operators    14    geometric    demonstrated    track    opex    estimation    integrates    payback    actions    jobs    time    downtime    kilometre    network    data    markets    laser    electrification    model    services    board    speed    rail    investment    12    accuracy    respectively    times    600    saas    competitiveness    works    distance    moved    adif    sensors    prototype    site    models    bim    drastically    tcat    spends    10    npv    infrastructure    created    predictive    company    reducing    innovative    detect    performed    q4    usa    automatically    maintenance    correlation    77    solution    thanks    25    launch    2019    perform    solutions    railways    2023    faster    inspections    38    overhead    expenses    80    total    evaluation    disruptive    irr    competitors    installation    accurately    8m    reduce    39    accounts    walking    preventive    on    tested    savings    eur    operations    workstation    meters    indicators    line   

Project "tCat" data sheet

The following table provides information about the project.

Coordinator
TELEFONOS LINEAS Y CENTRALES SA 

Organization address
address: CALLE ANABEL SEGURA 11 EDIF A 3 PL
city: ALCOBENDAS
postcode: 28108
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.tcat.es
 Total cost 1˙948˙500 €
 EC max contribution 1˙363˙950 € (70%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-07-01   to  2019-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TELEFONOS LINEAS Y CENTRALES SA ES (ALCOBENDAS) coordinator 1˙363˙950.00

Map

 Project objective

On average, the rail sector spends 39,600 EUR per kilometre of track on rail infrastructure maintenance, which accounts for 38% of total operating expenses. For the rail sector it is crucial to reduce OPEX costs to increase its competitiveness. tCat workstation is an innovative rail trolley that will contribute to drastically reduce maintenance costs related to overhead line equipment. tCat integrates, among other sensors, two laser distance meters (Competitors only use one laser) having lower and higher accuracy and being moved, in correlation, at respectively higher and lower speed. Thanks to its on-board technology tCat is able to automatically and accurately detect any overhead line elements and measure track geometric parameters. In addition, tCat allows on-site data processing including BIM predictive maintenance services offered through SaaS model and therefore immediate maintenance actions can be taken during walking inspections, which will reduce infrastructure downtime. As result, thanks to tCat the overhead line maintenance processes will be performed between 5 and 6 times faster reducing costs up to 80%. This makes tCat a disruptive and unique solution in terms of cost savings and preventive maintenance operations. In this project, the current prototype will be evolved and adapted to main markets and infrastructure characteristics. Evolved tCat models will be tested and demonstrated by some of the largest rail infrastructure operators in the EU and USA (Network Rail and ADIF). Our estimation is that 5 years after the launch of the product (estimated by Q4 of 2019) we will have captured about 12-14% of the EU market and 10% of USA market, becoming one of the main solutions used to perform installation, electrification and maintenance works in railways. Most important investment evaluation data are: By 2023, the company will have created more than 25 jobs and get profitability indicators as IRR 77%, NPV 2,8M€, payback time 3 years.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TCAT" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TCAT" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1.)

Zbox (2018)

ZBOX: THE NEXT GENERATION OF FOLDABLE CONTAINERS

Read More  

LEDVAR-Z (2018)

A New Paradigm for Efficient and Modern Rail Signalling

Read More  

Day-by-day (2017)

Day-by-Day Short-Term Traffic Forecasts for Road Concessions (top app)

Read More