Coordinatore | AREVA NP GMBH
Organization address
address: Paul-Gossen-Str. 100 contact info |
Nazionalità Coordinatore | Germany [DE] |
Totale costo | 5˙212˙033 € |
EC contributo | 2˙971˙757 € |
Programma | FP7-EURATOM-FISSION
EURATOM: Nuclear fission and radiation protection |
Code Call | FP7-Fission-2009 |
Funding Scheme | CP-FP |
Anno di inizio | 2010 |
Periodo (anno-mese-giorno) | 2010-01-01 - 2013-12-31 |
# | ||||
---|---|---|---|---|
1 |
AREVA NP GMBH
Organization address
address: Paul-Gossen-Str. 100 contact info |
DE (ERLANGEN) | coordinator | 571˙894.00 |
2 |
COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Organization address
address: RUE LEBLANC 25 contact info |
FR (PARIS 15) | participant | 277˙340.00 |
3 |
EDF ENERGY NUCLEAR GENERATION LIMITED
Organization address
address: "Barnett Way, Barnwood" contact info |
UK (BARNWOOD) | participant | 204˙431.00 |
4 |
UNIVERSITY OF BRISTOL
Organization address
address: TYNDALL AVENUE SENATE HOUSE contact info |
UK (BRISTOL) | participant | 195˙600.00 |
5 |
AREVA NP SAS
Organization address
address: 1 place de la Coupole - Tour AREVA contact info |
FR (COURBEVOIE) | participant | 165˙125.00 |
6 |
Serco Limited
Organization address
address: Bartleywood Business park 16 contact info |
UK (Hook) | participant | 159˙479.00 |
7 |
JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION
Organization address
address: Rue de la Loi 200 contact info |
BE (BRUSSELS) | participant | 157˙748.00 |
8 |
ELECTRICITE DE FRANCE S.A.
Organization address
address: avenue de Wagram 22-30 contact info |
FR (PARIS) | participant | 128˙750.00 |
9 |
TEKNOLOGIAN TUTKIMUSKESKUS VTT
Organization address
address: TEKNIIKANTIE 4 A contact info |
FI (ESPOO) | participant | 124˙250.00 |
10 |
USTAV JADERNEHO VYZKUMU REZ A.S.
Organization address
address: HUSINEC - REZ 130 contact info |
CZ (HUSINEC) | participant | 124˙250.00 |
11 |
THE UNIVERSITY OF MANCHESTER
Organization address
address: OXFORD ROAD contact info |
UK (MANCHESTER) | participant | 121˙500.00 |
12 |
REGIA AUTONOMA PENTRU ACTIVITATI NUCLEARE DROBETA TR. SEVERIN RA SUCURSALA CERCETARI NUCLEARE PITESTI
Organization address
address: Cimpului 1 contact info |
RO (MIOVENI - ARGES) | participant | 102˙250.00 |
13 |
BAY ZOLTAN ALKALMAZOTT KUTATASI KOZALAPITVANY
Organization address
address: FEHERVARI UT 130 contact info |
HU (BUDAPEST) | participant | 102˙000.00 |
14 |
MAGYAR TUDOMANYOS AKADEMIA KFKI ATOMENERGIA KUTATOINTEZET
Organization address
address: KONKOLY THEGE MIKLOS UT 29-33 contact info |
HU (BUDAPEST) | participant | 101˙750.00 |
15 |
INSTITUT DE SOUDURE ASSOCIATION
Organization address
address: RUE DES VANESSES 90 ZI PARIS NORD contact info |
FR (VILLEPINTE) | participant | 93˙750.00 |
16 |
RINGHALS AB
Organization address
address: HALLANDS 13 VARBERG 83 contact info |
SE (VAROBACKA) | participant | 84˙640.00 |
17 |
TECNATOM S.A.
Organization address
address: Avenida Montes de Oca 1 contact info |
ES (SAN SEBASTIAN DE LOS REYES - MADRID) | participant | 81˙250.00 |
18 |
STUDIECENTRUM VOOR KERNENERGIE
Organization address
address: Herrmann Debrouxlaan 40 contact info |
BE (Brussel) | participant | 63˙250.00 |
19 |
NUCLEAR RESEARCH AND CONSULTANCY GROUP
Organization address
address: Westerduinweg 3 contact info |
NL (PETTEN) | participant | 57˙250.00 |
20 |
FRAUNHOFER-GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V
Organization address
address: Hansastrasse 27C contact info |
DE (MUENCHEN) | participant | 55˙250.00 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components will be identified within the project based on the operators’ experience supported by an efficient knowledge management database system. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation/growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety-relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project (“STYLE TOOLS”) will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project will interact with the European Network of Excellence NULIFE.'
The reactor coolant pressure boundary (RCPB) provides a barrier against the release of radioactivity in a reactor. An EU-funded project is developing advanced tools to ensure its integrity and functionality for safe operation of a nuclear power plant (NPP).