Coordinatore | D'APPOLONIA SPA
Organization address
address: Via San Nazaro 19 contact info |
Nazionalità Coordinatore | Italy [IT] |
Totale costo | 7˙680˙485 € |
EC contributo | 5˙050˙000 € |
Programma | FP7-NMP
Specific Programme "Cooperation": Nanosciences, Nanotechnologies, Materials and new Production Technologies |
Code Call | FP7-2011-NMP-ENV-ENERGY-ICT-EeB |
Funding Scheme | CP-IP |
Anno di inizio | 2012 |
Periodo (anno-mese-giorno) | 2012-03-01 - 2016-02-29 |
# | ||||
---|---|---|---|---|
1 |
D'APPOLONIA SPA
Organization address
address: Via San Nazaro 19 contact info |
IT (GENOVA) | coordinator | 590˙410.44 |
2 |
POLITECNICO DI MILANO
Organization address
address: PIAZZA LEONARDO DA VINCI 32 contact info |
IT (MILANO) | participant | 712˙575.50 |
3 |
MAGNETTI BUILDING SPA
Organization address
address: VIA DON ANGELO PEDRINELLI 118 contact info |
IT (CARVICO) | participant | 706˙884.20 |
4 |
STAM SRL
Organization address
address: Via Venti Settembre 18/5 contact info |
IT (Genova) | participant | 457˙520.00 |
5 |
EIDGENOESSISCHE MATERIALPRUEFUNGS- UND FORSCHUNGSANSTALT
Organization address
address: Ueberlandstrasse 129 contact info |
CH (DUEBENDORF) | participant | 388˙400.00 |
6 |
INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Organization address
address: WEST OF SCOTLAND SCIENCE PARK contact info |
UK (GLASGOW) | participant | 319˙865.60 |
7 |
NATIONAL TECHNICAL UNIVERSITY OF ATHENS - NTUA
Organization address
address: HEROON POLYTECHNIOU 9 ZOGRAPHOU CAMPUS contact info |
EL (ATHINA) | participant | 283˙040.00 |
8 |
CIM-MES PROJEKT SP ZOO
Organization address
address: UL. AL. JEROZOLIMSKIE 125/127 LOK 503 contact info |
PL (WARSZAWA) | participant | 274˙800.00 |
9 |
S&B INDUSTRIAL MINERALS MINING OUARRYING INDUSTRIAL COMMERCIAL TOURISTSHIPPING TECHNICAL COMPANY SA
Organization address
address: AN METAXA STREET 15 contact info |
EL (KIFISSIA ATHINA) | participant | 257˙030.00 |
10 |
"PRZEDSIEBIORSTWO ROBOT ELEWACYJNYCH ""FASADA"" SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA"
Organization address
address: Cementowa 5-9 contact info |
PL (Gdansk) | participant | 208˙400.00 |
11 |
HALFEN SRL
Organization address
address: VIA FRATELLI BRONZETTI 28 contact info |
IT (BERGAMO BG) | participant | 169˙496.83 |
12 |
ANCODARQ SL
Organization address
address: CALLE FUENTE SANTA 6 contact info |
ES (MADRID) | participant | 161˙200.00 |
13 |
BUILDINGS PERFORMANCE INSTITUTE EUROPE ASBL
Organization address
address: RUE DE LA SCIENCE 23 contact info |
BE (BRUXELLES) | participant | 126˙440.00 |
14 |
RIDAN SP ZOO
Organization address
address: UL. SAPIEZYNSKA 10 contact info |
PL (WARSZAWA) | participant | 122˙400.00 |
15 |
IMPRIMA COSTRUZIONI SRL
Organization address
address: PIAZZA MADRE TERESA DI CALCUTTA 11/12 contact info |
IT (VILLA DI SERIO) | participant | 103˙419.39 |
16 |
Schwenk Putztechnik GmbH & Co. KG
Organization address
address: Hindenburgerring 15 contact info |
DE (Ulm) | participant | 80˙000.00 |
17 |
EUROPEAN CONSORTIUM OF ANCHORS PRODUCERS
Organization address
address: VIA MONTE GRAPPA 7 contact info |
IT (Bergamo) | participant | 61˙650.00 |
18 |
Imprima Construction Cz a.s.
Organization address
address: PLZENSKA 421/48 contact info |
CZ (PRAHA 5 - SMICHOV) | participant | 26˙468.06 |
Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.
'EASEE aims at developing a tool-kit for energy efficient envelope retrofitting of existing multi-storey and multi-owner buildings which combines novel design and assessment strategies, modular prefabricated elements, advanced insulating materials and new scaffolding-free installation approaches, to reduce energy demand, minimising the impact on occupants while preserving the façade original appearance. Particularly, the project will target residential buildings with cavity walls built before 70’s. These buildings require façade retrofitting for technical reasons or improvements in the insulation and energy efficiency to reduce the energy demand, while the conservation of the building appearance is necessary. EASEE will focus on the 3 main components of the envelope that influence the energy performance of multi-storey building, namely the outer façade, the cavity walls and the interior envelope, by developing innovative and easy to implement solutions. A new range of specific solutions will be developed within the project, that will be combined according to the characteristics of the building to be retrofitted as well as to other non technical parameters as for example cost and location of the building, also within the district. The proposed approach will allow for an overall retrofitting cost over the whole life cycle and for a total cost of ownership up to 120 Euro/m2 allowing a return on investment below 7 years. EASEE will reduce overall retrofitting duration and optimise the worksite in general with direct benefits for the workers and the occupants, while creating new business opportunities worth 4 BEuro in energy efficient retrofitting of existing buildings by the 5th year after project completion, mobilising new cooperation schemes between Les and local SMEs through licensing mechanisms. This is fully in line with the expected impact in the call and with the overall goal of the EeB PPP under the recovery plan.'
Hybrid organic/inorganic memory elements for integration of electronic and photonic circuitry
Read More